Loading...
915 S BROOKHURST ST (11)i Permit Types eLD ELE MEC PLM X XI I X Permit Number: BLD2022-01707 Issued: 01/12/2023 CITY OF ANAHEIM BUILDING DIVISION 200 $. ANAHEIM BLVD. (7141 765. 5153 www.anaheim.net/building (714)765-4626 Quarter Section: 34 Site Address: 915 S BROOKHURST ST, ANAHEIM, CA 92804 Legal Description: P BK 35 PG 41 PAR 1 PM 35-41 PAR 1 R 2 AND PM 18-3 APN: 12726140 Project Description: Tenant Improvement: 150 sq ft to for new sushi prep area with new prep sink in deli space with associated plumbing and electrical for "Ralphs" Living Area: Garage Area: Carport Area: Balcony / Deck Area: Cool R.I. People Associated with Project Number of Stories: Permit Applicant JAMES LUND Owner PK II BROOKHURST CENTER LP Architect/Engineer BRADLEY J WILLIAMS Engineer -Mechanical TAHMOORES NASROLLAHI Engineer - Electrical MEL ANTHONY FAJARDO 1 valuation: Cotntruclion Types: Occupancy Groups: Fire Sprinklered: Total Feas paid for Parma: 3333 NEW HYDE PARK RD 100 245 EAST 3RD ST LONG BEACH, CA 90802 Westlake Village Industries Park Westlake Village, CA 91365 3611 CAHUENGA BLVD WEST LOS ANGELES, CA 90068 15,0130.00 1118 M, M, M Yes 1.371.20 Type Electrical Fixtures Cry Type Plumbing Fixtures Cry Mechanical Fixtures Cry Apparatus or equipment not listed 1 Floor Sink 1 p, ShyP Receptade, switches, lights 5 Kitchen Sink 1 8 % Sb2 62g-Bc�,-7 3 G'-1t `� / 1 The permit shell expire by limitation and became null end void "a building or work has not passed final Inspection 365 days hom Its data of permit Issuance. A new permit Is required to commence or continue work. - PIIEIM ��` City of Anaheim D4 iO Building Division F i DVNDED tgft '1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable Items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final 32• i Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) .Y, Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subftoor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 3.-23 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures iE Plumbing Inspections Framing (Only after Pog_ Ele.. Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service