915 S BROOKHURST ST (11)i Permit Types
eLD ELE MEC PLM
X XI I X
Permit Number: BLD2022-01707
Issued: 01/12/2023
CITY OF ANAHEIM
BUILDING DIVISION
200 $. ANAHEIM BLVD.
(7141 765. 5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 34
Site Address: 915 S BROOKHURST ST, ANAHEIM, CA 92804
Legal Description: P BK 35 PG 41 PAR 1 PM 35-41 PAR 1 R 2 AND PM 18-3
APN: 12726140
Project Description: Tenant Improvement: 150 sq ft to for new sushi prep area with new prep sink in deli space with associated
plumbing and electrical for "Ralphs"
Living Area:
Garage Area:
Carport Area:
Balcony / Deck Area:
Cool R.I.
People Associated with Project
Number of Stories:
Permit Applicant
JAMES LUND
Owner
PK II BROOKHURST CENTER LP
Architect/Engineer
BRADLEY J WILLIAMS
Engineer -Mechanical
TAHMOORES NASROLLAHI
Engineer - Electrical
MEL ANTHONY FAJARDO
1 valuation:
Cotntruclion Types:
Occupancy Groups:
Fire Sprinklered:
Total Feas paid for Parma:
3333 NEW HYDE PARK RD 100
245 EAST 3RD ST LONG BEACH, CA 90802
Westlake Village Industries Park Westlake Village, CA 91365
3611 CAHUENGA BLVD WEST LOS ANGELES, CA 90068
15,0130.00
1118
M, M, M
Yes
1.371.20
Type Electrical Fixtures
Cry
Type Plumbing Fixtures
Cry
Mechanical Fixtures Cry
Apparatus or equipment not listed
1
Floor Sink
1
p,
ShyP
Receptade, switches, lights
5
Kitchen Sink
1
8 %
Sb2
62g-Bc�,-7 3
G'-1t
`� / 1
The permit shell expire by limitation and became null end void "a building or work has not passed final Inspection 365 days hom Its
data of permit Issuance. A new permit Is required to commence or continue work.
- PIIEIM ��`
City of Anaheim D4 iO
Building Division F i
DVNDED tgft '1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
32•
i
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
.Y,
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subftoor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
3.-23
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
iE
Plumbing Inspections
Framing (Only after Pog_ Ele.. Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service