Loading...
526 S ARCHER ST (11)Permit Types BLD ELE MEC PLM X Permit Number: OLD2022-01318 Issued: 03/28/2022 www.anaheim.net/building (714)765.4626 Quarter Section: 40 Site Address: 526 S ARCHER ST, ANAHEIM, CA 92804 Legal Description: N TR 1988 BILK LOT 2 APN: 12817310 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 .5153 Project Description: Reroof: Remove existing material, resheath as necessary and install (25) squares of composi0on shingles on to house and attached garage. LMng Area: Number of Stories. 0 Valuation 8,500,00 Garage Area: Construction Types: NIA Carport Area. Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof. Total Fees paid for Permit: 339.11 People Associated with Project: Contractor SOLID ROOFING 8033 SUNSET BLVD LOS ANGELES, CA 90046 Permit Applicant Tair Pivko Owner ODONNELL MARK D 8 PETI 526 S ARCHER ST Type Electrical Fixtures City Type Plumbing Fixtures Mechanical Fixtures The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�pH El M �-qt Cityof Anaheim OF io Building Division X ? u >� �oVNO EO"ten Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete u-!o the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned Building Final (714 765-5153) Last Inspection -Final Only After Above Comple+.ed _ Plumbing (Ground/Underfloor Water) - -z Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Feint.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA(Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) t�2Z Do not tape or plaster until the following applicable items have been signed' Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor , Do not backfill unless R cried off) Sewer Water Engineering Backflow (Testable Only) Water Service