130 S DELANO STPermit Number: BLD2020-04660
Issued: 03/08/2021
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 9
Site Address: 130 S DELANO ST
Legal Description: N TR 4230 LOT 25
CITY OF ANAHEIM
.,i oi��c pi,�ilSl!7 PI
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Repair: Replace damaged beam and stud wall at garage's #2 and 3, 450 sq ft of drywall, damaged
electrical and water heaters. REF INV2020-00326
Valuation: $15,000.00
Constnxion Types: VB, ,
Fire Sprinklered? No
Total Fees paid for Permit: 1.826.95
People Associated with Project:
Owner BOB C HAMMON TR P O BOX 4105 DOWNEY CA 90241-1105
Engineer HANS C HANSEN 180 MAIN ST STE 201 TUSTIN CA 92780
Contractor ROBERT'S CONSTRUCTION 11779 CARDINAL CIR GARDEN GROVE CA 92843 0000
Type Electrical Fixtures City Type Plumbing Fixtures Qty Type Mechanical Fixtures Cry
Receptacle, switches, lights
10 Water Heater
2
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit Issuance. A new permit is required to commence or continue work. fbid_permit _combo
'�t,F1elm C�<
Cityof Anaheim g4 1O
Building Division /_ 2
\ED /��-- X,, ^
�O
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final PERF11
Cross Connection Control (714) 765.42w
n
S f
Engineering Final (714) 765-5126
'^
T
yr_
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041 _
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765339'l I— -
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Formsrrrenches (Footings)
COA/Migation Measures
Do not install subgoor or pour floor slab until the follwing applicable items have been
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or sonwal the work below until the following applicable items have
been sinned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg De Mec & P,rey
Insulation (Sound/Energy)
Dc nei tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service