Permit Number: BLD2021-04902
Issued: 11/08/2021
www.anaheim.net/building
(714)7654626
Quarter Section: 92
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Site Address: 526 N HAWTHORN ST
Legal Description: N TR 1559 BLK LOT 11
APN:03532321
Project Description: Reroof: Overlay 1 layer - 2,400 sq. ft. of composition shingle over house and attached garage.
Living Area: Number of Stories:
1 Valuation: 10.500.00
Garage Area:
Construction Types: N/A
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Perna: 340.37
People Associated with Project:
Contractor HERIBERTO ALCANTAR ROOFING
1709 S RENE DRIVE SANTA ANA, CA 92705
Owner BENNER GREGORY ALAN
526 N HAWTHORN ST
Type Electrical Fixtures Cry Type Plumbing Fixtures Cry Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�pM EI At CqC
Cityof Anaheim ok i0
Building Division F z
u i
�NVDEO 1s"i
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrere unt I the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
last Inspection -Final Only After Above Completed
I
/� 1 iC
/j 1
Leel
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
i /j1e
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA(Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Flog)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set wthin 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service