943 N HELENA ST B (2)Permit Types
LLD
ELE
MEC
PLM
X
X
X
X
Z
Permit Number: BLD2020-03641
Issued: 03/23/2021
INSPECTION REtIUEST LINE:
(714) 765 - 4626
Quarter Section: 71
Site Address: 943 N HELENA ST B (Second
Legal Description: N TR 374 BLK A LOT 25
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: (ADU) Residential Addition: Convert 348 sq.ft detached accessory dwelling with (2) Bedroom, bathroom,
kitchen.
Living Area: 348 Dwelling Units: 1 Valuation: $20,000.00
Construcion Types: VB. ,
Fire Sprinklered? No
Total Fees paid for Permit: 2.387.10
People Associated with Project:
Owner DIANNA MOYA 943 N HELENA ST ANAHEIM CA 92805.1816
Contractor CALIFORNIA NRG INC 14553 DELANO ST 315 VAN NUYS CA 91411
Permit Applicant OSMONALIEVSABZHAR
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Meter/Disc Sw - under 600 V, up to 200 1 Shower 1 Air Handling Units 1
amps Lavatory 1 Heating/Cooling Coil 1
Receptacle, switches, lights 1
Water Closet 1 Compressor/Boiler - up to 15 hp 1
Kitchen Sink 1
Repair/Drainage AlterationNent Piping 1
Water Heater 1
Water Distribution • •1.
Gas System (1-5 outlets) 1
Water Main per 100 ft. 1
Sewer per 100 ft. 1
The permit shall expire by limitation and become null and void if the building or work has notpassed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work:*
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
INSPECTION DATE INSPECTOR
Do not pour concrete until the following applicable items have been signed:
lumbing (Ground/Underfloor Drain Waste) 5&q tl
lectrical Ground Electrode/Ufer
not install subtloor or pour floor slab until th1
sioned:
imbing (Ground/Underfloor Water)
iderfloor Rough Gas
�chanical (Groundwork)
mtrical (Underground Conduit)
e-slab (Compaction/Membrane Reinf.)
for (JoisUGirders)
Iderfloor Insulation (Raised Foundation
)or Nailing (Raised Foundation Only)
d Floor (Floor Nailing)
Do not cover or conceal the work below until
fat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Duct(Mech
Mechanical
Electrical
Rough COA/Mitagation Measures
Framing t0my after Plbg., Ele., Mac. & Fire) A21
Insulation (Sound/Energy) M • %
D� � not tape or plaster until the following applicable items have been
II Penetrations (Ele, Mac & Plbg)
r Lath
x Lath
eat Service Meter -(Meter will be set within 2-7
;s days after approval) Excludes New
uction
)r Plaster (Brown Coat)
Struct., Ele., or Mec.)
Interceptor
hackfill unless sianpd off)
Engineering Backflow (Testable Only)
Service
FINAL INSPECTIONS I DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final -Z
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
COA/Mlaation Measures
have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections