917 N HELENA ST BPermit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2021-02626
Issued: 02/23/2022
www.anaheirn.net/building
(714)7654626
Quarter Section: 71
Site Address: 917 N HELENA ST B, ANAHEIM, CA 92805
Legal Description: N TR 374 BLK A LOT 19
APN: 03423118
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: (ADU) Residential Addition: 206 sq ft to convert existing detached garage to new studio accessory dwelling unit.
Living Area: 206 Number of Stodea: 1 Valuation:
Garage Area: Construction Types:
carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spdnklered:
Cool Roof: Total Fees paid for Parmit:
People Associated with Project
20,000,00
VB
No
2.008.10
Contractor VIRIDI CONSTRUCTION INC 9301 CORBIN AVE SUITE 1700 206 202102021517221582 NORTHRIDGE. CA 91303
Permit Applicant Kadna Bernal
Owner JOSE JAVIER VILLEGAS 917 N HELENA ST ANAHEIM, CA 92805
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures City
Meter/Disc Sw - Under 600 V, up to 200 1 Garbage Disposal 1 Air Handling Units 1
amps Gas System (outlets) 1 Compressor/Boiler- up to 15 hp 1
Receptacle, switches. lights 12 Kitchen Sink 1 Ventilation Fan - <= 300 cfm on single duct 2
Lavatory
Sewer per 100 ft.
Shower
Water Closet
Water Heater
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
�HEIA1
Anaheim
City of Ana 1 l., 1 e i m 61
Building Division Z\
u >
0 NDED /
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
-
Electrical Final
Plumbing Final
Mechanical Final
12
°lam
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE TINSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
er Engineering (714) 766-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAlMigation Measures
Do not install subfloor or pour floor slab until the follwmg 6pplicable, items have been
Building Final (714 765-5153)
Last lnspection,Final Only After Above Comnlc+ol
I)L
Plumbing (Ground/Underfloor Water) A
MIS
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Ins ectio 15 �+� �-AA �e
� 21 Z _ pc�d 4�, 4
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
////9
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
-Z
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
- 2
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
/( /Z3
,Q ///,
/� `�r
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service
I l Jj
• 'lam"-"