711 S HARBOR BLVD B (2)Permit Types
BLD ELE ME
C PLM
X
Permit Number: BLD2024-01357
Issued: 03/15/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 73
Site Address: 711 S HARBOR BLVD B, Anaheim, CA 92805
Legal Description: N TR 1453 BLK LOT 101
APN: 03617418
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Project Description: Reroof: Remove and install (26) sq of composition shingles over the entire house
Living Area:
Number of Stones:
1 Valuation: 17,000.00
Garage Area:
Construction Types: N/A
CarportArea:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Root:
Total Fees pale for Pemft 351.21
People Associated with
Project:
Contractor
WATERSHIELD ROOFING CO
1543 W 85TH STREET LOS ANGELES, CA
Permit Applicant
Israel Farias
Owner
SANCHEZ, RODRIGO 8 MAROSANA
711 S HARBOR BLVD
Electrical Fixtures City Type Plumbing Fixtures Dry Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PHP LEIM C-
City of Anaheim c iO
Building Division F 2
U '
�oVNDED 1$A1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab luntil the tollwing applicable items have been
nned
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed
l
j
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
rnngfriirtinn
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service