Loading...
433 S CAMELLIA ST (3)Permit Types BLD ELE I MEC L PLM X X X Permit Number: BLD2024-02711 Issued: 05/28/2024 www.anaheim.not/building (714)765-4626 Quarter Section: 40 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 433 S CAMELLIA ST, Anaheim, CA 92804 Legal Description: N TR 2369 BLK LOT 106 TR 2369 LOT 106 SLY 38 FT(AN APN:12816507 Project Description: Residential Remodel: Replace (1) shower with relile with Electrical and Mechanical for fixture upgrades in bathroom. Living Area: Number of Stories: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Contractor MBAMP;M RENOVATIONS INC 8941 ATLANTA AVE 244 HUNTINGTON BEACH, CA Permit Applicant Nathan Marcum Owner LUCIAN, DIANNE E 433 S CAMELLIA ST 6,600.00 VB 292.85 Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Qty Receptacle, switches, lights 10 Shower 1 Ventilation Fan - c- 300 rim on single duct 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. �PFIEIM Cq Cityof Anaheim of h CvA Building Division i > • �CUA'D ED t4+h^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/FormslTrenches (Footings) Do not install subfhor cr pour floc slab until the follvdng applicable items have been COA/Migation Measures Building Final (714 765.5153) Last Inspection -Final Only After Above Completetl ,ry\� n1 Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) - 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1 st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Zia yy `� •L� •h' Plumbing Ins e-�ccttions Apic tj 27 • 2� Framing (Only after Plbg Elie.. Mac & Fire) Insulation (Sound/Energy) Do no[ tape or plaster until the following applicable items have been si ed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter wall be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service