840 N CLEMENTINE ST BPermit Types
BLD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2022-05895
Issued: 09/05/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 71
CITY OF ANAHEIM
Site Address: 840 N CLEMENTINE ST B, Anaheim, CA 92805
Legal Description: N TR 399 BLK A LOT 16
APN: 03424405
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: (ADLI) Residential Addition: 300 sq it detached garage and 387 sq ft cobana to be converted to new detached
accessory dwelling unit. (1 BD/1 BA)
Living Area: 687 Number of Stories:
Garage Area:
Carport Area:
Balcony / Deck Area:
Cool Ro.f
People Associated with Project
t Valua6an: 100,000.00
Constr ickm Types: VB
Occupancy Groups:
Fire Sprinklored:
Total Fees paid for Permh: 3,670.88
Permit Applicant
Ali Ehsani
8091 FORELLE DR HUNTINGTON BEACH, CA 92646
Owner
AMINI MORTEZA TR
30517 CAMINO PORVENIR
Contractor
AE CONSTRUCTION
8091 FORELLE DRIVE #1 HUNTINGTON BEACH, CA 90023
Engineer - Civil
FRED YAZDAN
58 FEATHER RIDGE2014031712IM4000 MISSION VIEJO, CA 92692
Type Electrical Fixtures
City Type Plumbing Fixtures
Qty
New or total rewire -1 or 2 family
687 Dishwasher
1
Sub Panel/Temp Pwr- Under 600 V, up to
1 Garbage Disposal
i
200 amps
Gas System (outlets)
1
Kitchen Sink
1
Lavatory
i
Repair/Drainage AlterationNent Piping
1
Sewer per 100 0.
1
Shower
1
Washing Machine Rough
1
Water Closet
1
Water Heater
1
Water Main per 100 ft.
1
Mechanical Fixtures Qty
Condenser 2
Heating Appliances, including vent 1
Heating/Cooling Coil 1
Residential Registers (ducts) 4
Ventilation Fan - <= 300 chin on single duct 1
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim P'PNEIM(:gt
Building Division ?
•
oUNDEC) ta`' •
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
I DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE
FINSPECTOR
Fire Sprinkler (ONLY) (714) 765-6041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor cr pour floor slab until the follwin applicable ms have been
'Inner!Building
Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
7�
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been qionpd
1st Floor Shear
—
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
r
y
Rough Mechanical
Af 7-
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele_ Mee. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable ite s ave been signed
Drywall
Drywall Penetrations (Ele, Met: & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
r
Water Engineering Backflow (Testable Only)
Water Service