Loading...
840 N CLEMENTINE ST BPermit Types BLD ELE MEC PLM X X X X Permit Number: BLD2022-05895 Issued: 09/05/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 71 CITY OF ANAHEIM Site Address: 840 N CLEMENTINE ST B, Anaheim, CA 92805 Legal Description: N TR 399 BLK A LOT 16 APN: 03424405 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: (ADLI) Residential Addition: 300 sq it detached garage and 387 sq ft cobana to be converted to new detached accessory dwelling unit. (1 BD/1 BA) Living Area: 687 Number of Stories: Garage Area: Carport Area: Balcony / Deck Area: Cool Ro.f People Associated with Project t Valua6an: 100,000.00 Constr ickm Types: VB Occupancy Groups: Fire Sprinklored: Total Fees paid for Permh: 3,670.88 Permit Applicant Ali Ehsani 8091 FORELLE DR HUNTINGTON BEACH, CA 92646 Owner AMINI MORTEZA TR 30517 CAMINO PORVENIR Contractor AE CONSTRUCTION 8091 FORELLE DRIVE #1 HUNTINGTON BEACH, CA 90023 Engineer - Civil FRED YAZDAN 58 FEATHER RIDGE2014031712IM4000 MISSION VIEJO, CA 92692 Type Electrical Fixtures City Type Plumbing Fixtures Qty New or total rewire -1 or 2 family 687 Dishwasher 1 Sub Panel/Temp Pwr- Under 600 V, up to 1 Garbage Disposal i 200 amps Gas System (outlets) 1 Kitchen Sink 1 Lavatory i Repair/Drainage AlterationNent Piping 1 Sewer per 100 0. 1 Shower 1 Washing Machine Rough 1 Water Closet 1 Water Heater 1 Water Main per 100 ft. 1 Mechanical Fixtures Qty Condenser 2 Heating Appliances, including vent 1 Heating/Cooling Coil 1 Residential Registers (ducts) 4 Ventilation Fan - <= 300 chin on single duct 1 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim P'PNEIM(:gt Building Division ? • oUNDEC) ta`' • Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE FINSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor cr pour floor slab until the follwin applicable ms have been 'Inner!Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) 7� Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been qionpd 1st Floor Shear — Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) r y Rough Mechanical Af 7- Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele_ Mee. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable ite s ave been signed Drywall Drywall Penetrations (Ele, Met: & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer r Water Engineering Backflow (Testable Only) Water Service