Loading...
922 N MONTEREY STPermit Types BLD 1 ELE MEC PLM X X Permit Number: BLD2024-03210 Issued: 08/28/2024 www.anaheim.net/bu i Iding (714)765-4626 Quarter Section: 31 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 922 N MONTEREY ST, Anaheim, CA 92801 Legal Description: N TR 1202 BLK LOT 118 APN: 07116214 Project Description: Photovoltaic with Micro -Inverters: Install residential roof mounted solarwith (17) modules, (17) micro -inverters, (1) 125 amp sub panel, (1) 200 amp production meter bd Living Area: Number of Stories: 1 Valuation: 13,770.00 Garage Area Construction Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 1,143.79 People Associated with Project: Contractor LGCY INSTALLATION SERVICES LLC DBA LG 3333 N. DIGITAL DRIVE STE 600 LEHI, UT Permit Applicant Mary Hernandez Owner GONZALEZ, ROCIO 922 N MONTEREY ST Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Meter/Disc Sw - Under 600 V, up to 200 1 amps Microinverter 17 Sub Panel/Temp Pwr - Under 600 V. up to 1 - 200 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PSI, ElM (',t� City of Anaheim OF 10 Building Division F i u a �OVA'OEO `sFni Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final `(/(I Plumbing Final Mechanical Final Cross Connection Control (714) 7664280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7664591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sToned Building Final (714 765-5153) Last Impaction -Final Only After Above Completed Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Pibg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Met; & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned off) Sewer Water Engineering Backflow (Testable Only) Water Service