922 N MONTEREY STPermit Types
BLD
1 ELE
MEC
PLM
X
X
Permit Number: BLD2024-03210
Issued: 08/28/2024
www.anaheim.net/bu i Iding
(714)765-4626
Quarter Section: 31
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 922 N MONTEREY ST, Anaheim, CA 92801
Legal Description: N TR 1202 BLK LOT 118
APN: 07116214
Project Description: Photovoltaic with Micro -Inverters: Install residential roof mounted solarwith (17) modules, (17) micro -inverters, (1)
125 amp sub panel, (1) 200 amp production meter
bd
Living Area:
Number of Stories:
1 Valuation: 13,770.00
Garage Area
Construction Types: VB
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit: 1,143.79
People Associated with Project:
Contractor LGCY INSTALLATION SERVICES LLC DBA LG
3333 N. DIGITAL DRIVE STE 600 LEHI, UT
Permit Applicant Mary Hernandez
Owner GONZALEZ, ROCIO
922 N MONTEREY ST
Type Electrical Fixtures
Oty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Meter/Disc Sw - Under 600 V, up to 200
1
amps
Microinverter
17
Sub Panel/Temp Pwr - Under 600 V. up to
1 -
200 amps
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PSI, ElM (',t�
City of Anaheim OF 10
Building Division F i
u a
�OVA'OEO `sFni
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
I DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
`(/(I
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7664280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 7655041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 7655041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7664591
Electrical Ground Electrode/Ufer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
sToned
Building Final (714 765-5153)
Last Impaction -Final Only After Above Completed
Plumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Pibg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Met; & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sioned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service