Permit Number: BLD2011-02747
Issued: 07/15/2011
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 61
Site Address: 727 W NORTHGAT=tN' '!
Legal Description: KOEFFLER TR.LOT LOT IN TR
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM-BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: Construct (1) new load bearing wall between kitchen and dining room area.
Replace 128 sf. of drywall in kitchen area.
Valuation: $1.000.00
Conslrucion Types: N/A, ,
Fire Sprinklered? No
Cool Roof No
Total Fees paid for Permit: 819.17
People Associated with Project:
Owner JUANA G ESTRADA 727 W NORTHGATE LN ANAHEIM CA 92805-1742
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Receptacle, switches, lights 5 GeS8ystem('��"�k`- ,� 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
Np,H EIM �.��
City of Anaheim OF P <'
Building Division f i
u a
1
o�Noep `sh
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final PE
Mechanical Final C`
Cross Connection Control ( 1
Engineering Final (714) 765--MA
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7 1- =.
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subl'oor or pour floor slab until the follwing applicable items have been
Building Final (714 7655153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg,. Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Ptbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless , n,d off)
Sewer
Water Engineering Backflow, (Testable Only)
Water Service