Loading...
727 W NORTHGATE LNPermit Types BLD ELE MEC PLM X X X Permit Number: BLD2011-02747 Issued: 07/15/2011 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 61 Site Address: 727 W NORTHGAT=tN' '! Legal Description: KOEFFLER TR.LOT LOT IN TR CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM-BLVD. (714) 765 - 5153 Project Description: Residential Remodel: Construct (1) new load bearing wall between kitchen and dining room area. Replace 128 sf. of drywall in kitchen area. Valuation: $1.000.00 Conslrucion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 819.17 People Associated with Project: Owner JUANA G ESTRADA 727 W NORTHGATE LN ANAHEIM CA 92805-1742 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Receptacle, switches, lights 5 GeS8ystem('��"�k`- ,� 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. Np,H EIM �.�� City of Anaheim OF P <' Building Division f i u a 1 o�Noep `sh Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final PE Mechanical Final C` Cross Connection Control ( 1 Engineering Final (714) 765--MA INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7 1- =. Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subl'oor or pour floor slab until the follwing applicable items have been Building Final (714 7655153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg,. Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Ptbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless , n,d off) Sewer Water Engineering Backflow, (Testable Only) Water Service