433 W FALCON STPermit Types /r- �\
BLD ELE MEC PLM j��44
x r%1 o
Permit Number: BLD2019-01289
Issued:03/28/2019 CITY OF ANAHEIM
INSPECTION REQUEST LI BUILDING DIVISION
(714) 765 - 4626 200 S. ANAHEIM BLVD.
Quarter Section: 47S� (714) 765 - 5153
Site Address: 433 S FALCON ST
Legal Description: N TR 2402 LOT 41 Y
Project Description: Reroof: Remove existing material, resheath as necessary and install (23) squares of shing Owens
Corning shingles onto house and attached garage.
Valuation: $8,500.00
Construcion Types: WA. ,
Total Fees paid for Permit: 306.11
People Associated with Project
Owner LUIS AVALOS 433 S FALCON ST ANAHEIM CA 92604-2611
Contractor R H ROOFING INC 2020 S SUSAN UNIT R SANTA ANA CA 92704 0000
Permit Applicant RAFEL HENRIQUEZ
Type Electrical Fixtures City Type Plumbing Fixtures City Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbid_permit_combo
City of Anaheim PaPVIEW Cqt
OF iO
Building DIVISION F' y
>
�OVNDED tB�A
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-428
I RED
Engineering Final (714) 765-5126
I N
P "
JON
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041 NOT
PON4
I PIED
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4 91
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (AII 1
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subs or or Dour foor slab until the follwing applicable items have been
sioned
Building Final (714 7655153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
boon sioncd
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
o
uw"-r'L�
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plb- a Mec. & Fire
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signe
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struts., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service