Loading...
433 W FALCON STPermit Types /r- �\ BLD ELE MEC PLM j��44 x r%1 o Permit Number: BLD2019-01289 Issued:03/28/2019 CITY OF ANAHEIM INSPECTION REQUEST LI BUILDING DIVISION (714) 765 - 4626 200 S. ANAHEIM BLVD. Quarter Section: 47S� (714) 765 - 5153 Site Address: 433 S FALCON ST Legal Description: N TR 2402 LOT 41 Y Project Description: Reroof: Remove existing material, resheath as necessary and install (23) squares of shing Owens Corning shingles onto house and attached garage. Valuation: $8,500.00 Construcion Types: WA. , Total Fees paid for Permit: 306.11 People Associated with Project Owner LUIS AVALOS 433 S FALCON ST ANAHEIM CA 92604-2611 Contractor R H ROOFING INC 2020 S SUSAN UNIT R SANTA ANA CA 92704 0000 Permit Applicant RAFEL HENRIQUEZ Type Electrical Fixtures City Type Plumbing Fixtures City Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit_combo City of Anaheim PaPVIEW Cqt OF iO Building DIVISION F' y > �OVNDED tB�A Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-428 I RED Engineering Final (714) 765-5126 I N P " JON INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 NOT PON4 I PIED Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4 91 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (AII 1 Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subs or or Dour foor slab until the follwing applicable items have been sioned Building Final (714 7655153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have boon sioncd 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) o uw"-r'L� Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plb- a Mec. & Fire Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signe Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struts., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service