934 N EUCLID STIt u -L
Permit Types
BLD ELE MEC I PLM
X X X X
Permit Number: BLD2018-04862
Issued: 02/21/2019
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 52
Site Address: 934 N EUCLID ST
Legal Description: SEC 9 T 4 R 10 POR NW1/4 NW1/4
?Fµrt i
�` C
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
CO
Project Description: Tenant Improvement: Construct new non -load bearing partitions. Mechanical, plumbing and electrical for
new preparation station and walk-in cooler replacement for "Chino's Market".
Number of Stones 1 Valuation:
$7,450.00
Construcion Types:
WA, ,
Fire Spnnklere0
No
Total Fees paid for Permit:
2,395.00
People Associated with Project
Owner OTTO HASSELBARTH 2O23 CRONE ANAHEIM CA 92804-3522
Permit Applicant RAMON CONTRERAS
Engineer EDUARDO CARRILLO 8207 BROOKGREEN DOWNEY CA 90240
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Receptacle, switches, lights
18 Kitchen Sink
Service, Mop, Slop Sink
4 Heating Appliances, including vent
1 Commercial Systems per 1,000 sq It
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit Issuance. A new permit is required to commence or continue work. fbid_permn_combo
�NhNE1M Cq(
City of Anaheim O� io
Building Division F i
u >
"60 DED tI
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final PERM
!RE
Cross Connection Control (714) 765-4280
INS
T
,
Engineering Final (714) 765-5126
^ r )'
-- ;Z
INSPECTION
I DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591 -
---
--...
Electrical Ground Electrode/Ufer
Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days)
SetbackfForms/Trenches (Footings)
COAIMigation Measures
Do not install subf1cor or pour Floor slab until the follwing applicable items have been
sioned
Building Final (714 765.5153)
Last Ir/spectiun-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mltagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mee. & Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
rnnctnirtinn
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mee.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service