Loading...
924 N FERN STPermit Types BLD ELE MEC PLM X Permit Number: BLD2023-05021 Issued: 10/02/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 38 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5163 Site Address: 924 N FERN ST, ANAHEIM, CA 92801 Legal Description: N TR 1803 BLK LOT 31 -.- - - ill 07246519 Project Description: Patio Cover: 260 sq ft attached solid patio cover with electrical Living Area: Number of Stones: 0 Valuation: 9,650.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: No Cool Roof: Total Fees paid for Permit: 389.02 People Associated with Project: Contractor SYSTEM PAVERS LLC 1570 BROOKHOLLOW DRIVEABCDE11169171 SANTA ANA, CA 92705 Permit Applicant Troy Ybarra Owner JACKSON, BRADLEY L TR 924 N FERN ST Type Electrical Fixtures Oty Type Plumbing Fixtures Qty Mechanical Fixtures Cry The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. ��PNEH4 c'` Cityof Anaheim O� io Building Division ' 2 u S �oUNDED tad^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 1191,10 7— Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4691 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed ✓✓//./�jjbf✓✓ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Bulldin Ins actions JG�/ Ll-CAL-2 o^ i4 Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been %aned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Pfbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construct on Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service