203 N DAHLIA DRPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-04008
Issued: 08/05/2024
www.anaheim.net/bu i Iding
(714)765-4626
Quarter Section: 39
Site Address: 203 N DAHLIA DR, ANAHEIM, CA 92801
Legal Description: N TR 1775 BLK LOT 80
APN: 07249206
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD,
(714) 765 -5153
Project Description: Reroof: Remove and install (19) sq of composition shingles over house and attached garage
Ell
Living Area:
Number of Stones:
0 valuation: 10,000.00
Garage Area:
Construction Types: N/A
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Spnnklered:
Cool Roof:
Total Fees paid for Permit: 350.30
People Associated with Project:
Contractor
JOURNEY BUILDERS
3111 WINONA AVE UNIT 103 BURBANK, CA
Permit Applicant
Nick Sargsyan
Owner
BYASSEE, SUSAN TR
203 N DAHLIA DR
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures ply
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PaPME1M cq`
Cityof Anaheim OF iO
Building Division _� ?
U >
• Out, DED
Do not occupy this buildinc until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 7655126
INSPECTION I DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed-
Fire Dept. Final (714) 7655041
Plumbing (GroundlUnderfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
SetbacklFormsrrmnches (Footings)
COAIMigation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
signedBuilding
Final (714 765-5153)
Last Inspection -Final Only After Above Completed
d2./
Plumbing(GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
-
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(no not backfill unless % chat off)
Sewer
Water Engineering Backilow (Testable Only)
Water Service