Loading...
203 N DAHLIA DRPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-04008 Issued: 08/05/2024 www.anaheim.net/bu i Iding (714)765-4626 Quarter Section: 39 Site Address: 203 N DAHLIA DR, ANAHEIM, CA 92801 Legal Description: N TR 1775 BLK LOT 80 APN: 07249206 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD, (714) 765 -5153 Project Description: Reroof: Remove and install (19) sq of composition shingles over house and attached garage Ell Living Area: Number of Stones: 0 valuation: 10,000.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: 350.30 People Associated with Project: Contractor JOURNEY BUILDERS 3111 WINONA AVE UNIT 103 BURBANK, CA Permit Applicant Nick Sargsyan Owner BYASSEE, SUSAN TR 203 N DAHLIA DR Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures ply The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PaPME1M cq` Cityof Anaheim OF iO Building Division _� ? U > • Out, DED Do not occupy this buildinc until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed- Fire Dept. Final (714) 7655041 Plumbing (GroundlUnderfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFormsrrmnches (Footings) COAIMigation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been signedBuilding Final (714 765-5153) Last Inspection -Final Only After Above Completed d2./ Plumbing(GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction - Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (no not backfill unless % chat off) Sewer Water Engineering Backilow (Testable Only) Water Service