Loading...
155 W LA PALMA AVE 1-11Permit Types BXD EX MXC 1 PX Permit Number: BLD2022-05507 Issued: 04/05/2023 www.a naheim. neUbuilding (714)765-4626 Quarter Section: 70 ci i'r :ri' AIN14+7E1nn BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 7/65-551155,3 Site Address: 155 W LA PALMA AVE 1-11, ANAHEIM, CA 92801 Legal Description: N TR 17846 BLK LOT 1 TRACT NO 17846 LOT 1 FOR OF L APN: 26715134 Project Description: New Residential Construction: 17,879 sq If construct 3-story, 11-plex condominiums with with 5,049 sq It of garages, 1,082 sq ft of decks, and roof mounted solar system. (Plan 4 2BD/2BA, Plan 5 3BD/2BA, Plan 6 4BD/2.5BA. Plan 7 3BD/3.5BA) REF: TRACT2021-00002 Living Area: 17879 Number of Stories: 3 Valuation: 3,411,340.80 Garage Area: 5049 Construction Types: VB Carport Area: Occupancy Groups: R2, U1, R2, U1, R2, U1, R2, U1, R2, U1, R2 Balcony I Deck Area: 1082 Fire Sprinklered: Yes Cool Roof Total Fees paid for Permit: 159,606.42 People Associated with Project: Contractor LENNAR HOMES OF CALIFORNIA LLC 2000 FIVEPOINT 3RD FLOOR201407011155160905 IRVINE, CA 92618 Permit Applicant Lani Labrecque Owner LENNAR HOMES OF CALIFORNIA INC 15131 ALTON PKWY 365 Type Electrical Fixtures City Meter/Disc Sw - Under 600 V, over 500 1 amps to 1000 amps Meter/Disc Sw - Under 600 V, up to 200 12 amps Microinverter 30 Motors - Factory Wired Appliance, up to 1 22 hp. New or total rewire - 1 or 2 family 17879 New or total rewire - garage/carport 5049 Sub Panelrremp Perr - Under 600 V, up to 12 2D0 amps Type Plumbing Fixtures Ory Mechanical Fixtures 04 Bath Tub 11 Air Handling Units 11 Dishwasher 11 Compressor/Boiler - up to 15 hp 11 Garbage Disposal 11 Heating Appliances. including vent 11 Residential Registers 118 Gas System (outlets) 11 Ventilation Fan - <= 300 cfm on single duct 79 Kitchen Sink 11 Lavatory 48 Private Sewage Disposal 11 Shower 14 Water Closet 33 Water Heater 11 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. Cityof Ananem . D� - �o Building Division F Z DLND eo t¢y^ Do not occupy this building until the final inspections have been made. U.— -V'eECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) '/$ 3 JSG Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follw g applicable items have been sioned Building Final (714 765-6153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) 3/g rj J SC Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections /,�7/nj /O3 r FL /19,V1,12 G Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) �t 07 �/ `JSG Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) 01N/ LL G — Floor Nailing (Raised Fou dati Only) - /9 d''( G! I-o" W Y F - •� 2nd Floor (Floor Nailing) J Do not cover or conceal the work n t�follown applicable items have ned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear 3r%D 7a'i ,— Roof heath' miaphrag 1Fra /j w j .j, Masonry (Reinf./Bond Beam/Pre-Grout) l) ay 4yC Rough Plumbing (Top Out) ti.a as JSG Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg. Ele.. Mec. & Fire) Insulation (Sound/Energy) i iH JSG Do not tape or plaster until the following applicable items have been signed' Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New K Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service option one CONSULTING ENGINEERS PAGE 1 OF 1 STRUCTURAL OBSERVATION REPORT CITY of ANAHEIM , CA THIS REPORT INCLUDES ALL CONSTRUCTION WORK THROUGH THE: Marco 13, 2024 PROJECT "Palmllla" - MFD Tract-17846 OPTION ONE J. N. 0517-2160 LOCATION Anaheim, California 92809 TRUSS MANUFACTURER Spates Fabricators OWNER Lennar Homes -California Coastal I -JOIST MANUFACTURER Boise Cascade, BCl Joists ARCHITECT Urban Areas ARCHITECTJ.N. 17-016 STRUCT. OBS. OF RECORD Ilia Sarad, P.E., S.E., S.E.C.B. LIC. OR REGISTRATION No. S-3855 STRUCTURAL OBSERVER Erik Tones, E.I.T. LIC. OR REGISTRATION No. OBSERVED STRUCTURAL ELEMENTS & THEIR CONNECTIONS, LOT(S) & PHASE OBSERVED: Interior and Exterior General Framing; i.e., rant trusses, roof sheathing, Pdase:3 Building d1 Type, shear elements, holdowns, floor sheathing, Boor trusses, beams, headers, and Homesites 0: log to 118, general hardware. 155 W. La Palma Ave., units 1-11 OBSERVED DEFICIENCIES: (ATTACH MOMONAL PAGES TNECFSSARY) The deficiencies noted during the observation visit have been corrected and/or installed by a collaborated effort of the foreman and project superintendent. Note: Portions of the Stucture were covered by drywall, insulation, plywood sheathing and framing elements not verified by Option One Consulting Engineers. Construction Stage: N/A El ElecRical El Plumbing Anaheim, California 92809 Initial / Completion Date E.T. 311"024 ❑ Double Sided El'wood "' ❑ Deck Shear Walls Lid(s)option �X Truss book IayouTo and details on Job -one verified With constructlon manager. Note: When box is checked, it indicates that construction stage is in progress, and it has not yet been completed at the time of observation was conducted QX STRUCTURAL SYSTEM WAS VISUALLY OBSERVED TO BE IN GENERAL CONFORMANCE WITH THE APPROVED PLANS STRUCTURAL DEFICIENCIES ARE OF A MINOR NATURE & MAY BE REVIEWED BY CITY BLDG INSPECTOR FOR COMPLIANCE I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE AND BELIEF 1. I AM THE REGISTERED ENGINEER WHO HAS RESPONSIBLE CHARGE FOR THE STRUCTURAL OBSERVATION. 2, L OR ANOTHER QUALIF ED-CHARGE OBSERVER WHO 1 HAVE DESIGNATED ABOVE AND IS UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT EACH SIGNIFICANT CONSTRUCTION STAGE TO VERIFY IF THE STRUCTURE IS IN GENERAL CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. 3. ALL DEFICIENCIES, WHICH I DOCUMENTED, HAVE BEEN CORRECTED UNLESS OTHERWISE INDICATED ABOVE. 4. ALL OBSERVED DEFICIENCIES SHALL BE CORRECTED AND APPROVED BY THE OBSERVER PRIOR TO FINAL ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY THE BUILDING DEPARTMENT. 5. THIS REPORT IS PROVIDED TO THE OWNER AS A PART OF THE OWNERS OVERALL CONSTRUCTION QUALITY CONTROL PROGRAM. 6. OPTION ONE HAS PROVIDED STRUCTURAL OBSERVATION IN ACCORDANCE WITH THE SEAOC RECOMMENpED GUIDELINES FOR THE PRACTICE OF STRUCTURAL ENGINEERING ALIFORNIA �=Plpi 11IIJ11x1-i;ls n l nMr Ur t,NUINEEK-Ur-KEWI STRUCTURAL OBSERVATION DOEJ NOT JAIVE THE REQUIREMENTS FOR INSPECTIONS BY CITY BUILDING INSPECTORS. ALL WORK MUST COMP WI THE APPROVED PLANS AND APPLICABLE STATE & LOCAL CODES. 2400-50R_Fmlg_61d02_un1ts 105-118_2-15-24sdo Option One Tel 714.556.1916 Consulting Engineers 2755 Bristol Street, Suite 100, Costa Mesa, Ca. 92626 Fax 714.556.1952 i r;in:nan l'F ,llturririh h'fin,g SOUTHWEST A�A&�.A�AkA&�&AILA���.A6.AAL Inspection & T(( sling' Inc_ 441 Commercial Way. La Habra, CA90631-6168 (562) 941-2990 • (714) 520-WI FAX (562) 946-0026 July 19, 2024 City of Anaheim Department of Building & Safety 200 South Anaheim Blvd. Anaheim, CA 92805 SPECIAL INSPECTOR'S FINAL PROJECT REPORT Project Name: Palmilla — Building 2 Phase 3 Address: Tract 17846, Anaheim Owner: Lennar Homes Unit# Address Permit # Unit# Address Permit # 108 155 W La Palma Ave#11 BLD2022-05507 109 155 W La Palma Ave#10 BLD202-05507 110 155 W La Palma Ave#09 BLD2022-05507 111 155 W La Palma Ave#08 BLD202-05507 112 155 W La Palma Ave#07 BLD2022-05507 113 155 W La Palma Ave#06 BLD202-05507 114 155 W La Palma Ave#05 BLD2022-05507 115 155 W La Palma Ave#04 BLD202-05507 116 155 W La Palma Ave#03 BLD2022-05507 117 155 W La Palma Ave#02 BLD202-05507 118 155 W La Palma Ave#01 BLD2022-05507 This is to certify that Southwest Inspection and Testing, Inc. was employed to perform special inspection on the above -mentioned project at the above address, which required special inspection per section 1701 of the California Building Code. Robert Langner- Post Tensioned Concrete, Reinforced Concrete, SIR2012-00017 Jason Sharobeem-Reinforced Concrete, ICC#9662561 Robert Langer, Shear Nailing, Wood Framing, SIR2012-00017 Based upon special inspection and materials testing written reports of this work, it is our judgment that the inspected work was performed to the best of our knowledge, in accordance with the approved plans, specifications and applicable workmanship provision of the California Building Code. Sincerely, Siident bey P SLG/IRW : dfk Reviewed r=y� 3-Si CIV(L Ian R. Waddel , C V Principal `- Engineer' For inspection and testing only, no design responsibility expressed or implied. IL w Appendix D: Certificate of Completion LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: (1) I am a professional appropriately licensed in the State of California to provide professional landscape design services for: Palm_illa Building 2, Phase 3 BLD2022-05507. (project name, mailing address and telephone). (2) The landscape project for the property located at: 155 W. La Palma Avenue, Anaheim, CA 92801 (provide street address or parcel number(s)) was installed by me or under my supervision. (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Anaheim Landscape Water Efficiency Ordinance (Chapter 10.19 of Title of 10 of Anaheim Municipal Code) and the Guidelines for Implementation of the City of Anaheim Landscape Water Efficiency Ordinance. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. X Yes No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & Emitter Standard. X Yes No 27 (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the Guidelines for Implementation of the City of Anaheim Landscape Water Efficiency Ordinance. Rick Polhamus Print Name Signature 3190 B-2 Airport Loop Drive Costa Mesa, CA 9262 Address 949-644-9370 Telephone Landscape Design Professional's Stamp (If Appropriate) SAND 2782 'e 07/22/2024 Date RLA 2782 License Number E-mail Address 28