Loading...
911 N KEYSTONE STPermit Types BLD ELE ME C PLM X Permit Number: BLD2023-00943 Issued: 02/28/2023 vivinw.anaheim.net/bulding (714)765-3626 Quarter Section: 38 Site Address: 911 N KEYSTONE ST, ANAHEIM, CA 92801 Legal Description: N TR 1803 BLK LOT 87 APN: 07246411 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 �pF1ia_M ( 1 i� 1) Ell Project Description: Reroof: To remove existing and install (25) sq of composition and shingles over house and attached garage. Living Area: Number of Stories: t Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Rocf: Total Fees paid for Permit: People Associated with Project: Permit Applicant Josue Garcia Owner JOSHUA GARCIA 911 NN KEYSTONE ST 13.000.00 N/A Ul 69 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�pF1 EIM cq` Cityof Anaheim 04 A, Building Division y > �DVNDED ybh^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subtloor or pour floor slab until the follwing applicable items have been sioned. Building Final (714 765-5153) Last Inspection -Final Only After Above Completed w�� /- FX� Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS uilddiin� Inspections —Ilr�7j Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or eonceal the work below until the following applicable nems have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Ins ection 2nd F hear 96�risheathi4lDiaphragml!Frame) C1 Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Pog_ Eta Mac & Fire Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec 8. Flbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Met.) Grease Interceptor i0n not backfill unless signed off I Sewer Water Engineering Backflow (Testable Only) Water Service