911 N KEYSTONE STPermit Types
BLD ELE ME
C PLM
X
Permit Number: BLD2023-00943
Issued: 02/28/2023
vivinw.anaheim.net/bulding
(714)765-3626
Quarter Section: 38
Site Address: 911 N KEYSTONE ST, ANAHEIM, CA 92801
Legal Description: N TR 1803 BLK LOT 87
APN: 07246411
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
�pF1ia_M ( 1
i�
1) Ell
Project Description: Reroof: To remove existing and install (25) sq of composition and shingles over house and attached garage.
Living Area:
Number of Stories: t Valuation:
Garage Area:
Construction Types:
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Rocf:
Total Fees paid for Permit:
People Associated with Project:
Permit Applicant Josue Garcia
Owner JOSHUA GARCIA
911 NN KEYSTONE ST
13.000.00
N/A
Ul 69
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�pF1 EIM cq`
Cityof Anaheim 04 A,
Building Division y
>
�DVNDED ybh^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subtloor or pour floor slab until the follwing applicable items have been
sioned.
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
w��
/-
FX�
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
uilddiin� Inspections
—Ilr�7j
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or eonceal the work below until the following applicable nems have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Ins ection
2nd F hear
96�risheathi4lDiaphragml!Frame)
C1
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Pog_ Eta Mac & Fire
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec 8. Flbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Met.)
Grease Interceptor
i0n not backfill unless signed off I
Sewer
Water Engineering Backflow (Testable Only)
Water Service