536 N HANOVER STPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2023.06722
Issued: 12/19/2023
www.arkaheim.net/building
(714)765-4626
Quarter Section: 26
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
4714) 765 - 5153
Site Address: 536 N HANOVER ST, ANAHEIM, CA 92801
Legal Description: N TR 5113 BLK LOT 22
APN: 07149103 '.
Project Description: Reroof: Remove and install (38) sq of composition shingles over the entire house and attached garage
Living Area: Number of Stones:
i Valuation: 30,000.00
Garage Area:
Construction Types: NIA
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit 376.90
People Associated with Project:
Contractor TROY ROOFING INC
1066 E EDNA PLACE COVINA, CA 91724
Permit Applicant Lorena Gutierrez
Owner PRAWDZIK, KRISTIN ATR K
11 SONGVIEW
Type Electrical Fixtures Qty Type Plumbing Fixtures Cry Mechanical Fixtures Qty
The permit shalt expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PaPHEI,N �7<
Cityof Anaheim D4 io
Building Division F y
�OVNDED tbh^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sruned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed�1'
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele_ Mec. & Fire)
Insulation(Sound/Energy)
Pu not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
husness days alley approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service