105 W WILKEN WAY (2)Permit Types
BLD
ELE
MEC
PLM
X
X
Permit Number: BLD2024-00456
Issued: 02/22/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 89
Site Address: 105 W WILKEN WAY, Anaheim, CA 92802
Legal Description: N TR 1965 BLK LOT 60
APN: 23310311
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 76S - 5153
Project Description: Photovoltaic System: Install residential roof mounted solar system with (16) modules, (1) inverter and 225 amp
meter with 200 amp service.
Living Area: Number of Stories: 0 Valuation:
Garage Area: Construction Types:
Carport Area. Occupancy Groups:
Balcony I Deck Area, Fire Sprinklered,
Cool Roof: Total Fees paid for Permit:
People Associated with Project:
Contractor Scott LeDuc 1451 GRAFTON STREET201806041209185979 WORCESTER, MA 01581
Permit Applicant Lourdes Cordova
Owner GARCIA, LUIS A 105 W WILKEN WAY
16,000.00
N/A
No
831.08
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty
Inverter 1
Meter/Disc Sw - Under 600 V, up to 200 1
amps
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
City of Anaheim PNpHE IM C.q`
ok io
Building Division F i
C >
�pVNDED tali^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install _<ubfloor or pow !loos slab unto U;e follwmo applicable hems have been
-, ned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
ra lr
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing ( wy aftci Pltig Ne t0ec S rlre;
Insulation (Sound/Energy)
1)a ;tot tape ui placteF until the following applicable gems have been sgn,,ci
Drywall
Drywall Penetrations (Ele, Mee & Flog)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
�Iri��,y
Do-i l
VJ�
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mee.)
Grease Interceptor
o ,d ,
Sewer
Water Engineering Backflow (Testable Only)
Water Service