Loading...
105 W WILKEN WAY (2)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2024-00456 Issued: 02/22/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 89 Site Address: 105 W WILKEN WAY, Anaheim, CA 92802 Legal Description: N TR 1965 BLK LOT 60 APN: 23310311 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 76S - 5153 Project Description: Photovoltaic System: Install residential roof mounted solar system with (16) modules, (1) inverter and 225 amp meter with 200 amp service. Living Area: Number of Stories: 0 Valuation: Garage Area: Construction Types: Carport Area. Occupancy Groups: Balcony I Deck Area, Fire Sprinklered, Cool Roof: Total Fees paid for Permit: People Associated with Project: Contractor Scott LeDuc 1451 GRAFTON STREET201806041209185979 WORCESTER, MA 01581 Permit Applicant Lourdes Cordova Owner GARCIA, LUIS A 105 W WILKEN WAY 16,000.00 N/A No 831.08 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty Inverter 1 Meter/Disc Sw - Under 600 V, up to 200 1 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim PNpHE IM C.q` ok io Building Division F i C > �pVNDED tali^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install _<ubfloor or pow !loos slab unto U;e follwmo applicable hems have been -, ned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed ra lr Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing ( wy aftci Pltig Ne t0ec S rlre; Insulation (Sound/Energy) 1)a ;tot tape ui placteF until the following applicable gems have been sgn,,ci Drywall Drywall Penetrations (Ele, Mee & Flog) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New �Iri��,y Do-i l VJ� Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor o ,d , Sewer Water Engineering Backflow (Testable Only) Water Service