Loading...
709 S DORCHESTER ST (3)Permit Types BLD ELE MEC PLM X Permit Number: ELD2015-01606 Issued: 04115/2015 www.anaheim. neUbu ilding (714)765-4626 Quarter Section: 104 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 N Ptl�t-l�n� . rid Site Address: 709 S DORCHESTER ST, ANAHEIM, CA 92805 Legal Description: N TR 1697 LOT 18- APN:08235515 Project Description: Electrical for 200 amp main service panel upgrade Work completed prior to obtaining permit. REF: INV2018-00423 original INV for same scope with INV2015-00010; REF COD2018-06929 Living Area: Number of Stories: 0 Valuation: 0.00 Garage Area: Construction Types: Not Applicable Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: No Cool Roof: Total Fees paid for Permit: 348.77 People Associated with Project: Permit Applicant CHELSEA OMMANNEY Owner Johan M Hedlund 709 S. Dorchester St Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Meter/Disc Sw - under 600 V, up to 200 1 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�pHE1M CqC Cityof Anaheim DF io Building DIVISIOn F 2 I' OVNDED tsh^ not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Test Final Final al Final MControl nnection Control (714) 765�280Do ng Final (714) 765-5126INSPECTION DATE INSPECTOR kler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 766.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765d591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) SetbacklFormslTrenches (Footings) COAIMigation Measures Do not install sub0oor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153)sianed Last Inspection -Final Only Aker Above Completed r Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragmlFmme) Masonry (Reinf.lBond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service