144 S FRANCISCO STPermit Types
BLD ELF MEC PLM
X
Permit Number: BLD2021-02297
Issued: 05/24/2021
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 191
Site Address: 144 S FRANCISCO ST
Legal Description: N TR 7118 LOT 30
CITY OF ANAHEIM
DIN—, DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: Change out (13) retrofit windows and (2) doors with windows.
Valuation: $6,500.00
Construcion Types: WA, ,
Total Fees paid for Permit: 326.84
People Associated with Project
Owner STEPHEN L BRUBECK 144 S FRANCISCO ST ANAHEIM CA 92807-3917
Contractor RENEWAL BY ANDERSEN OF ORANGE COUNT 22982 ALCALDE DR 100 LAGUNA HILLS CA 92653
Permit Applicant ROBIN REDIRA RENEWAL BY ANDERSEN
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
PHEIM �„
Cityof Anaheim OF/P� .o
Building DIVISIon
\ ^ .
oUNDED \ati
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final PERM
IREE)
Mechanical Final
""����
Cross Connection Control (714) 7654NODT CMMP
TE
fr����
V
Engineering Final (714) 765-5126
INSPECTION I
DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5
�.Z
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Formsrrrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
gioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not h2cUil unless . ened off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service