Loading...
88 E ORANGETHORPE AVE (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2021-03592 Issued: 01/11/2022 vvvvvv.anaheirn.net/buiIding (714)765-4626 Quarter Section: 69 CITY OF ANAHEIM Site Address: 88 E ORANGETHORPE AVE, ANAHEIM, CA 92801 Legal Description: T 4 R 10 SEC 3 POR NW1/4 APN: 07309031 BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 -5153 Project Description: Storage Racks: 308 If. x 10 ft. max high storage racks for "Walmart". Living Area: Garage Area: CarportArea: Balcony I Deck Area: Cool Roof: Number o/ Stories: 1 Valuation: Consintcton Types: 0c pancy Groups: Fire Spnnklered: Total Fees paid for Pe rnh: People Associated with Project: Owner SIRIANNI ENTERPRISES INC 88 E ORANGETHORPE AVE ANAHEIM, CA 92801 Contractor AUSTIN/JONES CORP 18575 JAMBOREE ROAD N600 IRVINE, CA 92612 Architect CHRISTOPHER DOERSCHLAG 19100 VON KARMAN AVE STE 600 201802161254241110 IRVINE, CA 92612 10,000.00 Not Applicable 627.00 Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�p,N EIM cq< City of Anaheim O� iO Building Division f�Z u a� Op pEo a ^' Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final r EXPIRED Plumbing Final INSPERIST' Mechanical Final Cross Connection Control (714) 76 - Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765RATE, I Do not pour concrel- ur:: ine following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subtloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only Aker Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backf law (Testable Only) Water Service