88 E ORANGETHORPE AVE (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2021-03592
Issued: 01/11/2022
vvvvvv.anaheirn.net/buiIding
(714)765-4626
Quarter Section: 69
CITY OF ANAHEIM
Site Address: 88 E ORANGETHORPE AVE, ANAHEIM, CA 92801
Legal Description: T 4 R 10 SEC 3 POR NW1/4
APN: 07309031
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765 -5153
Project Description: Storage Racks: 308 If. x 10 ft. max high storage racks for "Walmart".
Living Area:
Garage Area:
CarportArea:
Balcony I Deck Area:
Cool Roof:
Number o/ Stories:
1 Valuation:
Consintcton Types:
0c pancy Groups:
Fire Spnnklered:
Total Fees paid for Pe rnh:
People Associated with Project:
Owner SIRIANNI ENTERPRISES INC 88 E ORANGETHORPE AVE ANAHEIM, CA 92801
Contractor AUSTIN/JONES CORP 18575 JAMBOREE ROAD N600 IRVINE, CA 92612
Architect CHRISTOPHER DOERSCHLAG 19100 VON KARMAN AVE STE 600 201802161254241110 IRVINE, CA 92612
10,000.00
Not Applicable
627.00
Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�p,N EIM cq<
City of Anaheim O� iO
Building Division f�Z
u a�
Op pEo a ^'
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final r
EXPIRED
Plumbing Final INSPERIST'
Mechanical Final
Cross Connection Control (714) 76 -
Engineering Final (714) 765-5126
INSPECTION
I DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765RATE, I
Do not pour concrel- ur:: ine following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subtloor or pour floor slab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only Aker Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backf law (Testable Only)
Water Service