935 N MORAGA STPermit Types
BLD ELE MEC PLM
X
43
Permit Number: BLD2020-05281
Issued:12/31/2020
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 31
Site Address: 935 N MORAGA ST
Legal Description: N TR 1161 LOT 22
CITY OF ANAHEIM
Project Description: Foundation Bolting: installation of anchor bolt into sill plates.
People Assoclated
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Valuation:
Construcion Types:
Total Fees paid for Permit:
$3,500.00
VB, ,
598.50
Owner WILLIE A RHYMES TR 135 N BERKELEY AVE FULLERTON CA 928314501
Contractor GOLDEN RETROFIT ENCINO 16710 VENTURA BLVD UNIT #309 ENCINO CA 91436 0000
Permit Applicant YOSI SSADIA
Engineer AFSHIN KHAZRA 22855 PAUL REVERE DR CALABASAS CA 91302
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures City
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work.
��pFtE1M `
Cityof Anaheim D� iO
Building Division F 2
�OVNDED tad^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
r�
N
Engineering Final (774) 765.5126
L — r—
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041 E;
'3
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-6153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing i0nly after Plbp Fle Mec 6 =rer
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have heen signed
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mee.)
Grease Interceptor
in,, not hnnkfill,mlAss inner! nffi
Sewer
Water Engineering Backflow (Testable Only)
Water Service