800 N MAGNOLIA AVEPermit Types
LLD I ELE MEC PLM
X
Permit Number: BLD2021-00375
Issued: 01 /27/2021 (�
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 25
Site Address: 800 N MAGNOLIA AVE
Legal Description: N TR 2118 LOT 150
Project Description: Patio Enclosure: 136 sq.ft with electrical.
People Associated with Project
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
Valuation: $5,000.00
Construcion Types: N/A, ,
Total Fees paid for Permit: 105.00
Contractor RICK DORN CONST 13472 TAHOE ST WESTMINSTER CA 92683 0000
Permit Applicant RICK DORN
Owner WILLIAM NGUYEN
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
P�POEIAf ��<
Cityof Anaheim O� i0
Building Division ti Z
v >
�ovNDED
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
Ail applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
SFIE
r
Cross Connection Control (714) 765-4280 NCT=FE=
Engineering Final (714) 765-6126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor stab until the follwing applicable items have been
sioned
Building Final (714 765-5153)
Last Inspection -Final Only Aker Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been slaned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Fog_ Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Flog)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
inn not backfillunle%s sinned oft)
Sewer
Water Engineering Backflow (Testable Only)
Water Service