Loading...
502 S KNOTT AVE (2)Permit Types BUD ELE MEC PLM X Permit Number: BLD2022-02422 Issued: 07/01/2022 www.a na heim.neUbuilding (714)7654626 Quarter Section: 5 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765. 5153 Site Address: 502 S KNOTT AVE, ANAHEIM, CA 92804 Legal Description: S TWP 4 RGE 11 SEC 14 SEC 14 T 4 R 11 N 60.35 FT W APN:13535231 Project Description: Reroof: Install 60 squares of BUR over existing layer on commercial building. Living Area: Number of Stories: 0 Valuation: 80.000.00 Garage Area: C msbuclion Ty pes: WA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fee. paid for Perma: 429.40 People Associated with Project: Contractor ADCO SOUTH ROOFING AND WATERPROOF 1896 N MAIN STREET202W6160843584876 ORANGE, CA 92865 Permit Applicant John Batioff Owner KLM VENTURES LLC 23642 CALABASAS RD 104 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures pry The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PHEtnf c1C Cityof Anaheim D4 i0 Building Division F z s �OVNDED tah^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final PERMIT E XP Plumbing Final Mechanical Final r Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION l DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the tollwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagatlon Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Dr, not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service