502 S KNOTT AVE (2)Permit Types
BUD ELE MEC PLM
X
Permit Number: BLD2022-02422
Issued: 07/01/2022
www.a na heim.neUbuilding
(714)7654626
Quarter Section: 5
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
Site Address: 502 S KNOTT AVE, ANAHEIM, CA 92804
Legal Description: S TWP 4 RGE 11 SEC 14 SEC 14 T 4 R 11 N 60.35 FT W
APN:13535231
Project Description: Reroof: Install 60 squares of BUR over existing layer on commercial building.
Living Area: Number of Stories: 0 Valuation: 80.000.00
Garage Area: C msbuclion Ty
pes: WA
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fee. paid for Perma: 429.40
People Associated with Project:
Contractor ADCO SOUTH ROOFING AND WATERPROOF 1896 N MAIN STREET202W6160843584876 ORANGE, CA 92865
Permit Applicant John Batioff
Owner KLM VENTURES LLC 23642 CALABASAS RD 104
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures pry
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�PHEtnf c1C
Cityof Anaheim D4 i0
Building Division F z
s
�OVNDED tah^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final PERMIT
E
XP
Plumbing Final
Mechanical Final r
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION l
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the tollwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagatlon Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Dr, not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service