618 S KENMORE STPermit Types
BLD ELE MEC PLM
X
Parma Number. BLD2022-05137
Issued: 10/27/2022
www.anaheim.net/building
(714)765-4626
Quarter Section: 21
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141 765 .5153
Site Address: 618 S KENMORE ST, ANAHEIM, CA 92804
Legal Description: N TR 2874 BLK LOT 59
APN: 12619105
Project Description: Reroof: Remove existing material to install (25)
sq composition shingles and (5) sq torch down over entire house
and attached garage
Living Area: Number of Stories:
1 Valuation: 16,500.00
Garage Area:
Construction Types: NIA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered.
Cool Roo(
Total Fees peld for Permit: 341.15
People Associated with Project:
Peril Applicant Matt cMlller
905 S Calico Cir. Anaheim. CA 92804
Owner HONEYBOURNE LAWRENCE W TR
618 S KENMORE ST
Type Electrical Fixtures Cry Type Plumbing Fixtures Qty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�PHEIM �q<
City of Anaheim io
Building Division i
u a
�I&NDEO yap^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do nor install subfloor or pour floor slab until the follwing applicable Items have been
signed
Building Final (714 765.5153)
Last Inspection -Final Only After Above Completed / r
Z 2-
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame) '/
j-2Z.
✓py/C
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing Only after Rog Ele Uec & Filet
Insulation (Sound/Energy)
Do not rape of plaster until the following applicable items have keen slgnao
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service