Loading...
618 S KENMORE STPermit Types BLD ELE MEC PLM X Parma Number. BLD2022-05137 Issued: 10/27/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 21 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 .5153 Site Address: 618 S KENMORE ST, ANAHEIM, CA 92804 Legal Description: N TR 2874 BLK LOT 59 APN: 12619105 Project Description: Reroof: Remove existing material to install (25) sq composition shingles and (5) sq torch down over entire house and attached garage Living Area: Number of Stories: 1 Valuation: 16,500.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered. Cool Roo( Total Fees peld for Permit: 341.15 People Associated with Project: Peril Applicant Matt cMlller 905 S Calico Cir. Anaheim. CA 92804 Owner HONEYBOURNE LAWRENCE W TR 618 S KENMORE ST Type Electrical Fixtures Cry Type Plumbing Fixtures Qty Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PHEIM �q< City of Anaheim io Building Division i u a �I&NDEO yap^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do nor install subfloor or pour floor slab until the follwing applicable Items have been signed Building Final (714 765.5153) Last Inspection -Final Only After Above Completed / r Z 2- Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) '/ j-2Z. ✓py/C Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing Only after Rog Ele Uec & Filet Insulation (Sound/Energy) Do not rape of plaster until the following applicable items have keen slgnao Drywall Drywall Penetrations (Ele, Mec & Plbg) interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service