Loading...
333 W DISNEY WAYPermit Types BLD ELE MEC PLM X X Permit Number: BLD2024-03758 Issued: 09/05/2024 www.anaheim.net/building (714)7654626 Quarter Section: 87 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 47141 765 -5153 Site Address: 333 W DISNEY WAY, ANAHEIM, CA 92802 Legal Description: N TR 190 BLK LOT 20 TR 190 LOT 20 FOR OF LOT AND P APN: 08221104 Project Description: DLR - Pumba Parking Lot - Halloween Marathon'24 - Miscellaneous: Install (1) stage platforms, (2) truss towers, (2) truss arches anchored by concrete blocks. With associated electrical. (9/01/24 thru 9/09/24) Living Area: Number of Stories: 0 Valuation: Garage Area. Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: r, People Associated with Project: Owner MDMP CORPORATION WALT DISNEY WORLD PO BOX 5046 Engineer KENNETH E AGEE 3452 E FOOTHILL 626-4325850200101171447134090 PASADENA, CA 91107 D 25,000.00 N/A 2.721.00 Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures Oty Generators/Transformers - i to 10 hp, 1 2 to 75 kva. The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PHEIM ��( 1tity of Anaheim O� i0 Building Division _� i U > • OVA'DEO taft1 Do not occuov this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final v 2± min" . Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 7655126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfioor or pour Floor slab until the follwing applicable items have beensianed Building Final (714765-5153) Last Inspection -Final Only After Above Completed c1 I� Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been ne 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service