Loading...
527 N PARKWOOD STPermit Types BLD I ELE I MEC 1 PLM X Permit Number: BLD2020-00577 Issued:'02/06/2020 INSPECTION REQUEST LINE: (714) 76�5 - 4626 Quarter Section: 46 Site Address: 527 N PARKWOOD ST Legal Description: N TR 1591 LOT 101 CITY OF ANAHEIM EUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Remodel: Change out (8) retrofit windows and enlarge (3) to meet egress (header to remain). Valuation: $14,904.00 Gonstrucion Types: VB, , Total Fees paid for Permit: 313.59 People Associated with Project Owner PETRA P JOVERO 527 N PARKWOOD ST ANAHEIM CA 92801-4559 Contractor SEARS HOME IMPROVEMENT PRODUCTS 3333 BEVERLY RD HOFFMAN ESTATES IL 60179 Permit Applicant DANIEL BRIZUELA Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. ficApermit_combo P�hHEIM �7< City of Anaheim O4 iO Building Division F Az v > �OVNDED tad^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final tpi it Plumbing Final T Mechanical Final ) 0 Cross Connection Control 714) 765.4280 Engineering Final (714) 76 TE- INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklForms/frenches (Footings) COAfMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec 8 Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease interceptor Do not hankfill unlgq� sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service r. --. - -. --. - -. --. ... --. •-. --. --. •- . --. -- . ...... --.._.....-• --. - -. -- Ip L) I N H r Sao PATIO COVER xb Im I ,Ll, V1p J AO J ' xgx xr I.r y A O I 1 i`LZw nm a inm� OOO 0 mAW I 00 3 W 1 W 2n N m A Qm 1 W G i o z i D I Fr i 4� i i i C < 0 o l I LZ A O O xOx i x .y y n 3 E° izi � Nr � vCN Jrl+ � w z 2 / Gl I 2 i I I C. � I 77- [J c � m � ..; m ..: �••Q� � %L • p • J1 I ....�.I •.+ D _ _ :• ••r •`.-. 1 .-. .-. .-. .-- --. .__ .__ .-. .-. .-. .-. .-. .-_ .__ .__ .__ .-. .-. .-_ .-_ .__ ._. •' NltlM 3415 133NIS a00M)Iadd HIHON .wm