Loading...
400 N LEAF CIR- Re rmh Types 6 ' i �V� ij lo' C* BLD ELE MEC PLM CITY OF ANAHEIM X BUILDING DIVISION Permit Number: BLD2024-04750 200 S. ANAHEIM BLVD. Issued: 09/10/2024 (714)765. 5153 www.anaheim.net/building (714)765-4626 Quarter Section: 161 Site Address: 400 N LEAF CIR, ANAHEIM, CA 92807 Legal Description: N TR 7284 BLK LOT 35 APN: 35916304 Project Description: Residential EV Charger Level 2 Living Area: Number of Stones: Valualmn: 0.00 Garage Area: construction Types: Carpon Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: 177,00 People Associated with Project: Contractor OC ELECTRIC 17052 CARLANN CIR APT A TUSTIN, CA Permit Applicant Ruben Padilla 17052 Carlann Cir Apt A Tustin, CA 92780 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. City of Anaheim PNp,N EIM ,,t� O4 iO Building Division r' i u > - �DUNDED tS, Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final A1t1 Pt Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Do not pour concrete until the following applicable items have been signed- Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beensioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed n .� V\\� \ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable Items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/DiaphragmlFrame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service