Permit Number: BLD2023-06775
Issued: 12/20/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 192
Site Address: 259 S HILLCREST ST, Anaheim, CA 92807
Legal Description: N TR 6734 BLK LOT 55
APN: 36312304
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: To change out bathtub for (1) shower with tile in master bedroom and change out (1) bath tub
upstairs in hallway. Mechanical for (3) ventilation fan upgrades. Electrical fixture upgrades.
Living Area: Number of Stories: 2 valuation:
Garage Area. Construction Types:
Carport Area. Occupancy Groups:
Balcony I Deck Area: Fire Sprinklered:
Cool Roof. Total Fees paid for Permit:
People Associated with Project:
Contractor T & H CONSTRUCTION 19031 MILFORD CIRCLE201809211333541216 HUNTINGTON BEACH, CA 92646
Permit Applicant Tony Truong 1358 Vineland Ave Baldwin Park, CA 91706
Owner NAGAOKA, MICHAEL & JUDY 259 S HILLCREST ST
25,000.00
NIA
442.25
Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures City
Receptacle, switches, lights 16 Bath Tub 1 Ventilation Fan - <= 300 cfm on single duct 3
Shower 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�f,NEIM �.4(
Cityof Anaheim D4 iO
Building Division F i
u >
�06NDED tay1
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
17
'
Plumbing Final
-t
Mechanical Final
% 7M
Cross Connection Control (714) 765-4280
Engineering Final (714) 765.5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final Final my After
Last Inspection -Final Only After Above Completed
��`
\�`\7,r
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildina Inspection
3 4S/ly FidtwilT ph
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab(Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been stoned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (ReinfdBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Z `\
0�
Rough Duct (Mechanical)
Rough Mechanical
2j1
Rough Electrical
�N
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele_ Mec. & Fire)
3 7lM
-
\ et G-
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
31Sivt
1'Cio(-r'
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
3 Ij //mil
o
Exterior Lath
Electrical Inspections
Electrical Service Meter- Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service