Loading...
409 N JEANINE DRPermit Types 6LD ELE MEC PLM X Permit Number: OLD2023-02312 Issued: 05/11/2023 vinviiii.anaheim.net/building (714)7654626 Quarter Section: 133 Site Address: 409 N JEANINE DR, Anaheim, CA 92806 Legal Description: N TR 7218 BLK LOT UN HOLD APN: 26817101 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD, (714) 765 - 5153 Project Description: Re-roofcovering existing BUR and install (37) sq of 50-mil overlay. Living Area: Garage Area: Carport Area. Balcony / Deck Area: Cod Root Number of Stories: 0 Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permh: People Associated with Project: Contractor MCCARTHY ROOFING 625 WEST KATELLA AVE #29201905140819378210 ORANGE, CA 92867 Permit Applicant Cesar C Owner HOLD PARCEL 41,130.00 N/A 372.52 Type Electrical Fixtures Cry Type Plumbing Fixtures Oty Mechanical Fixtures Oty The permit shall expire by limitation and become null and Vold If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. l�PHEIM cd` Cityof Anaheim OF iO Building Division F i > • �g�ryD ED tad^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before ub _s are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete ur, 'allowing applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfioor or pour floor slab unto the follwing applicable items have been Building Final (714 765-5153) Last lospecllon-Final Only After Ab—e Comply _ Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following ail 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2 oof (Sheathing/Diaphragm/Frame) a em . Bond Beamtpre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagatlon Measures Plumbing Inspections Framing (Only after Plbg.. Ele_ Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following appi,cable dens have been sign"-d. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor in, no' ll tjnlas� � coed off) Sewer Water Engineering Backflow (Testable Only) Water Service