409 N JEANINE DRPermit Types
6LD
ELE
MEC
PLM
X
Permit Number: OLD2023-02312
Issued: 05/11/2023
vinviiii.anaheim.net/building
(714)7654626
Quarter Section: 133
Site Address: 409 N JEANINE DR, Anaheim, CA 92806
Legal Description: N TR 7218 BLK LOT UN HOLD
APN: 26817101
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD,
(714) 765 - 5153
Project Description: Re-roofcovering existing BUR and install (37) sq of 50-mil overlay.
Living Area:
Garage Area:
Carport Area.
Balcony / Deck Area:
Cod Root
Number of Stories:
0 Valuation:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permh:
People Associated with Project:
Contractor MCCARTHY ROOFING 625 WEST KATELLA AVE #29201905140819378210 ORANGE, CA 92867
Permit Applicant Cesar C
Owner HOLD PARCEL
41,130.00
N/A
372.52
Type Electrical Fixtures Cry Type Plumbing Fixtures Oty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and Vold If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
l�PHEIM cd`
Cityof Anaheim OF iO
Building Division F i
>
• �g�ryD ED tad^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before ub _s are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete ur, 'allowing applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfioor or pour floor slab unto the follwing applicable items have been
Building Final (714 765-5153)
Last lospecllon-Final Only After Ab—e Comply
_
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following ail
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2
oof (Sheathing/Diaphragm/Frame)
a em . Bond Beamtpre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagatlon Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele_ Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following appi,cable dens have been sign"-d.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
in, no' ll tjnlas� � coed off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service