109 S JEANINE WAYPermit Types
BLD
ELE
MEC
PLM
X
X
X
Permit Number: BLD2022-00514
Issued: 02/D4/2022
www.anaheim.net/building
(714)765-4626
Quarter Section: 133
Site Address: 109 S JEANINE WAY, ANAHEIM, CA 92806
Legal Description: N TR 7088 BILK LOT 25
APN: 26801253
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141 765 •5153
Project Description: Residential Remodel: Replace (1) shower with acrylic and (1) receptacle in bathroom
Living Area: Number of Stones: 1 Valuation:
Garage Area: Construction Types:
Carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Spnndered:
Cool Roof: Total Fees paid for permit:
People Associated with Project:
Contractor REBORN CABINETS DBA REBORN BATH SOL 5515 E LA PALMA AVENUE STE 250 ANAHEIM, CA 92807
Permit Applicant Emily Batiolf
Owner LY SANDRA 109 S JEANINE WAY
3,500.00
N/A
No
215.50
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Cry
Receptacle, switches, lights 1 Shower 1
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
?PHEIM cq
Cityof Anaheim P ��T
O.' O
Building Division
�FoG� ED j/
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final PER
E
Cross Connection Control (714) 765-4280
I N
Engineering Final (714) 765.5126
INSPECTION I
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5D41
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisUBus. Lie. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migatlon Measures
Do not install subtloor or pour floor slab until the tollwing applicable items have been
sianed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Com oletetl
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Bea nlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAlMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Eta, Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strucl., Ele., or Mee.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service