Loading...
109 S JEANINE WAYPermit Types BLD ELE MEC PLM X X X Permit Number: BLD2022-00514 Issued: 02/D4/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 133 Site Address: 109 S JEANINE WAY, ANAHEIM, CA 92806 Legal Description: N TR 7088 BILK LOT 25 APN: 26801253 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 •5153 Project Description: Residential Remodel: Replace (1) shower with acrylic and (1) receptacle in bathroom Living Area: Number of Stones: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnndered: Cool Roof: Total Fees paid for permit: People Associated with Project: Contractor REBORN CABINETS DBA REBORN BATH SOL 5515 E LA PALMA AVENUE STE 250 ANAHEIM, CA 92807 Permit Applicant Emily Batiolf Owner LY SANDRA 109 S JEANINE WAY 3,500.00 N/A No 215.50 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Cry Receptacle, switches, lights 1 Shower 1 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. ?PHEIM cq Cityof Anaheim P ��T O.' O Building Division �FoG� ED j/ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final PER E Cross Connection Control (714) 765-4280 I N Engineering Final (714) 765.5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5D41 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisUBus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migatlon Measures Do not install subtloor or pour floor slab until the tollwing applicable items have been sianed Building Final (714 765-5153) Last Inspection -Final Only After Above Com oletetl Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Bea nlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAlMitagation Measures Plumbing Inspections Framing (Only after Plbg.. Eta, Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strucl., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service