Loading...
326 S ILLINOIS STPermit Types BLD ELE MEC PLM X Permit Number: BLD2022-04198 Issued: 09/06/2022 www.anaheim. net/build i ng (714)765-4626 Quarter Section: 63 Site Address: 326 S ILLINOIS ST, ANAHEIM, CA 92805 Legal Description: N TR 351 BLK B LOT 9 APN: 03612225 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. f7141 765 - 5153 Project Description: Reroof: Remove existing material, re -sheathe as necessary, and install (17) sq of composition shingles over entire house and attached garage Lnriig Area: Number of Stories: Garage Area: Carport Area: Balcony I Deck Area: Cool Roof: People Associated with Project: Permit Applicant Roberto Aguilar Owner DE VIVO IDABELLE 326 S ILLINOIS ST 1 Valuation: 8,500.00 Consbuc8on Types: NIA Occupancy Groups: Fire Spdnklered: Total Fees paid for Parmk: 340.11 Type Electrical Fixtures Oty Type Plumbing Fixtures aty Mechanical Fixtures Oty The permit shall expire by limitation and become null and Void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNPN EIAt Cq< Cityof Anaheim D4 io Building Division _� z • �DGNDED tsh^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.428D Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 INSPECTION DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the tollwing applicable items have been i n ed Building Final (714 765-5153) Last Inspection -Final Only Aker Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) 2 K+ar% Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing 1Only after Plug Etc Mec & Frei Insulation (Sound/Energy) Do not tape or plaster until the tollowing applicable Items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-1 Meter will be set within 2-3 business days after approval) Excludes New Qringrjirtinn Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service