Permit Number: BLD2022-04198
Issued: 09/06/2022
www.anaheim. net/build i ng
(714)765-4626
Quarter Section: 63
Site Address: 326 S ILLINOIS ST, ANAHEIM, CA 92805
Legal Description: N TR 351 BLK B LOT 9
APN: 03612225
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
f7141 765 - 5153
Project Description: Reroof: Remove existing material, re -sheathe as necessary, and install (17) sq of composition shingles over entire
house and attached garage
Lnriig Area: Number of Stories:
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Roof:
People Associated with Project:
Permit Applicant Roberto Aguilar
Owner DE VIVO IDABELLE 326 S ILLINOIS ST
1 Valuation: 8,500.00
Consbuc8on Types: NIA
Occupancy Groups:
Fire Spdnklered:
Total Fees paid for Parmk: 340.11
Type Electrical Fixtures Oty Type Plumbing Fixtures aty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and Void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNPN EIAt Cq<
Cityof Anaheim D4 io
Building Division _� z
• �DGNDED tsh^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.428D
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
INSPECTION
DATE I
INSPECTOR
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the tollwing applicable items have been
i n ed
Building Final (714 765-5153)
Last Inspection -Final Only Aker Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof(Sheathing/Diaphragm/Frame)
2
K+ar%
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing 1Only after Plug Etc Mec & Frei
Insulation (Sound/Energy)
Do not tape or plaster until the tollowing applicable Items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-1 Meter will be set within 2-3
business days after approval) Excludes New
Qringrjirtinn
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service