Loading...
533 N CHANTILLY ST (10)Permit Types BLD ELE MEC PLM X Permit Number: BLD2021-03812 Issued: 08/30/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 122 Site Address: 533 N CHANTILLY ST Legal Description: TR 3614 LOT 1 ALL -EX FREEWAY - CITY OF ANAHEIM Project pescription: Residential Remodel: Change out (1) slider, no size changes. BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Valuation: $3,622.00 Construcion Types: N/A, . Total Fees paid for Permit: 167.00 People Associated with Project: Owner DAISY GUERRERO 533 N CHANTILLY ST ANAHEIM CA 92806 Contractor THE HOME DEPOT 1095 N PULLMAN ST ANAHEIM CA 92807 0000 Permit Applicant ZARA SIMONYAN Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. I -. City of Anaheim �, ' p Building Division F `3 U OUNDED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final RED Mechanical Final PERM EXP Cross Connection Control (714) 765-428 Engineering Final (714) 765-5126 NOT Cc M P L TE D INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5D41 Do not pour conce_,- .`ollowing applicable items have been signed: Fire Dept. Final (714) 765-5041 n A T _ Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-0591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forma/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reiri Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinfJBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mltagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been sign --: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backf 11 unless sinned off) Sewer Water Engineering Backflow, (Testable Only) Water Service