Loading...
116 N CAROUSEL STPermit Types BLD ELE MEC I PLM X Permit Number: BLD2021-04069 Issued: 09/15/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 122 Site Address: 116 N CAROUSEL ST Legal Description: N TR 3390 LOT 83 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Reroof: Tear off existing material and resheath as needed. Install (1,600) sq. ft. of comp shingle over house and attached garage. Replace (1,200) sq. ft of flat roof over portions of house and attahced garage Valuation: $7,800.00 Construcion Types: WA, , Total Fees paid for Permit: 339.01 People Associated with Project: Owner JAMES R REPPERT 116 N CAROUSEL ST ANAHEIM CA 92806-3207 Contractor REFINED ROOFING 309 MARWOOD AVE FULLERTON CA 92832 Permit Applicant MIKE BIONDINO 309 MARWOOD AVENUE ANAHEIM CA 92832 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. NPHEIM cq \ City of Anaheim pF b < o\ Building Division F Zy U In �06 �s"�" LADED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765 Engineering Final (714) 765-512ENIJ INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-50 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub Lisf/Bus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Comnlcled Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactiontMembrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof heathing/ aphragm/Frame) Maso JBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagatlon Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter wih be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not hacki 11 unless _qii off) Sewer Water Engineering Backflow, (Testable Only) Water Service v a E FL M v� % T Y i c 0 e c U) U L m l^ WW' v/ r o a Q Q � Q 0 � ea C fl- O U � U in �Q a) co T 41 i7 r 0 a