635 N VENTURA ST B-DPeril Types
BLD
ELE
MEC
PLM
X
X
Permit Number: ELD2022-02118
Issued: 05/13/2022
www.anaheim.net/building
(714)766-4626
Quarter Section: 31
CITY OF ANAHEIM
Site Address: 635 N VENTURA ST B-D, ANAHEIM, CA 92801
Legal Description: N TR 4060 BLK LOT 7
APN: 07145320
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141 765 -5153
Project Description: Residential Remodel: 120 sq It of drywall repair and plumbing to replace shower with tile in units B and D
Living Area: Number o1 Stories: 2 Valuation:
Garage Area: Conseucbon Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spnnklered:
Cool Roof: Total Fee. paid for Permit:
2,000.00
NIA
No
475.50
People Associated with Project:
Contractor PRO TECH CONSTRUCTION RESTORATION 8 2790 EAST REGAL PARK DR ANAHEIM, CA 92806
Permit Applicant Allison Pddy
Owner KOMIVA SOHJI 3157 ALTA VISTA RD C
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City
Shower 2
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�PNEIM C�`
Cityof Anaheim D� iO
Building Division ti i
v >
• �DUNDED I,
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final `'
f�'
o' y
r�
Cross Connection Control (7 ) i f"
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (7 T!&
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service