Loading...
635 N VENTURA ST B-DPeril Types BLD ELE MEC PLM X X Permit Number: ELD2022-02118 Issued: 05/13/2022 www.anaheim.net/building (714)766-4626 Quarter Section: 31 CITY OF ANAHEIM Site Address: 635 N VENTURA ST B-D, ANAHEIM, CA 92801 Legal Description: N TR 4060 BLK LOT 7 APN: 07145320 BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 -5153 Project Description: Residential Remodel: 120 sq It of drywall repair and plumbing to replace shower with tile in units B and D Living Area: Number o1 Stories: 2 Valuation: Garage Area: Conseucbon Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fee. paid for Permit: 2,000.00 NIA No 475.50 People Associated with Project: Contractor PRO TECH CONSTRUCTION RESTORATION 8 2790 EAST REGAL PARK DR ANAHEIM, CA 92806 Permit Applicant Allison Pddy Owner KOMIVA SOHJI 3157 ALTA VISTA RD C Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City Shower 2 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�PNEIM C�` Cityof Anaheim D� iO Building Division ti i v > • �DUNDED I, Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final `' f�' o' y r� Cross Connection Control (7 ) i f" Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (7 T!& Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service