Loading...
125 N SYRACUSE ST 45Permit Types BUD ELIE I EC PLM X X X Permit Number: BLD2024-01123 Issued: 03/05/2024 www.ana helm. nellbuilding (714)765.4626 Quarter Section: 19 CITY OF ANAHEIM BUILDING DMSION 200 S. ANAHEIM BLVD. f714) 765. 5153 Site Address: 125 N SYRACUSE ST 45, Anaheim, CA 92801 Legal Description: S TWP 4 RGE 11 SEC 12 SEC 12 T 4 R 11 2.50 AC MIL APN: 07060220 Project Description: Repair: 1,280 sf drywall to repair fire damage with associated elec. & mach. REF: INV2024-MOl0 l iWng Area: Garage Area: carport Area: 5akony I Deck Ares: Cool Roof: with Owner THE NORMANDY Number of Stories' PO BOX 19528 2 Valuation: Conslruc ion Types: occupancy Groups: Fire Sprinklered: Total Few paid for Permb: 12.000.00 VB 97e.74 Type Elactril"I Factures, Qty Type Plumbing Factures Qty Mechanical Filatures Qty New or total rewire - 1 or 2 family 700 Mml split (room unit) 1 Receplede, switches, fights 12 Sub PaneVTemp Pwr - Under 600 V, up to 1 200 amps The p urnIt shall expire by limitation and become null and void U the building or work has not passed final inspection 365 days Irom the dale of permit issuance. A new Permit Is required to commence or continue work. o ¢i \� A Cityof Anaheim Q t \T• Building Division wElectrical ocoiN^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Final Plumbing Final Zls�i: Mechanical Final rn Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 7655041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Was Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765.5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the fofwng applicable items have been sorted Building Final (714 7655153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas �I j�lZy PARTIAL INSPECTIONS 11 t Building Inspectlons Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Rail Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sill 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.IBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical ! 5 rl I TZ Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg Ele Mec ii Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service