Loading...
622 S GAYMONT STPermit Types BLD ELE MEC PLM X Permit Number: BLD2024-04589 Issued: 09/03/2024 www.ansheim.net/building (714)765-4626 Quarter Section: 14 Site Address: 622 S GAYMONT ST, ANAHEIM, CA 92804 Legal Description: N TR 5227 BLK LOT 13 APN: 12613128 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 17141 765 •5153 /NPHkIAi \\r\No ED Project Description: Reroof: Overlay existing layer with (24) sq of composition shingles over the entire house and attached garage LWing Area: Numberof Stones: 1 valuation: Garage Area: Construction Types: Can,ort Ama: occupancy Groups: Balcony I Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Permit Applicant Robert Myers Owner GOEN, SHARRA L 622 S GAYMONT ST 10,000.00 WA 361.30 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�t,Vi EIM p1( Cityof Anaheim O� io Building Division F 2 U > • �D�NDED �a�^ Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.6041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-6041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only Attar Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) y Masonry (Reinf.lBond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meier will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service