622 S GAYMONT STPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-04589
Issued: 09/03/2024
www.ansheim.net/building
(714)765-4626
Quarter Section: 14
Site Address: 622 S GAYMONT ST, ANAHEIM, CA 92804
Legal Description: N TR 5227 BLK LOT 13
APN: 12613128
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
17141 765 •5153
/NPHkIAi
\\r\No ED
Project Description: Reroof: Overlay existing layer with (24) sq of composition shingles over the entire house and attached garage
LWing Area: Numberof Stones: 1 valuation:
Garage Area: Construction Types:
Can,ort Ama: occupancy Groups:
Balcony I Deck Area: Fire Spnnklered:
Cool Roof: Total Fees paid for Permit:
People Associated with Project:
Permit Applicant Robert Myers
Owner GOEN, SHARRA L 622 S GAYMONT ST
10,000.00
WA
361.30
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�t,Vi EIM p1(
Cityof Anaheim O� io
Building Division F 2
U >
• �D�NDED �a�^
Do not occupy this buildina until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765.6041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-6041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Formsrrrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only Attar Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
y
Masonry (Reinf.lBond BeamlPre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meier will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service