683 S LASSEN CTPermit Types
BLD _ALE
MEC
PLM
X
Permit Number: BLD2023-02150
Issued: 05/03/2023
vAsAm.analreim.net/building
(714)765-4626
Quarter Section: 10
Site Address: 683 S LASSEN CT, ANAHEIM, CA 92804
Legal Description: N TR 15703 BLK LOT 15
APN: 07996137
Project Description: Residential EV Charger Level 2
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
1�
G �r
of,
Living Area:
Number of Stories: Valuation: 0.00
Goal Area.
Construction Types:
Carport Am:
Occupancy Groups:
Balcony / Deck Area:
Fire Spnnkbred.
Cod Roof
TWal Fees paid for Permit: 0.00
People Associated with Project:
Contractor OC ELECTRIC
17052 CARLANN CIR APT A TUSTIN, CA
Permit Applicant Ruben Padilla
17052 Carlann Cir Apt A Tustin, CA 92780
Type Electrical Fixtures
Oly Type Plumbing Fixtures Qty Mechanical Fixtures Cry
EV Charger
1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
�NI,HEIM ��<
Cityof Anaheim D� iO
Building Division F Z
>
• 'ou DED �sgn
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subflcor or pour floor slab until the follwing applicable items have beensioned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
JTu'WI
Plumbing (GroundlUnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girdem)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (SheathinglDiaphragmlFrame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing iOnly after Plbg Ele.. Mec. 8 Firel
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes Now
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service