Loading...
683 S LASSEN CTPermit Types BLD _ALE MEC PLM X Permit Number: BLD2023-02150 Issued: 05/03/2023 vAsAm.analreim.net/building (714)765-4626 Quarter Section: 10 Site Address: 683 S LASSEN CT, ANAHEIM, CA 92804 Legal Description: N TR 15703 BLK LOT 15 APN: 07996137 Project Description: Residential EV Charger Level 2 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 1� G �r of, Living Area: Number of Stories: Valuation: 0.00 Goal Area. Construction Types: Carport Am: Occupancy Groups: Balcony / Deck Area: Fire Spnnkbred. Cod Roof TWal Fees paid for Permit: 0.00 People Associated with Project: Contractor OC ELECTRIC 17052 CARLANN CIR APT A TUSTIN, CA Permit Applicant Ruben Padilla 17052 Carlann Cir Apt A Tustin, CA 92780 Type Electrical Fixtures Oly Type Plumbing Fixtures Qty Mechanical Fixtures Cry EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. �NI,HEIM ��< Cityof Anaheim D� iO Building Division F Z > • 'ou DED �sgn Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subflcor or pour floor slab until the follwing applicable items have beensioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed JTu'WI Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdem) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (SheathinglDiaphragmlFrame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing iOnly after Plbg Ele.. Mec. 8 Firel Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes Now Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service