918 E WEAVER LNPermit Types O /1 6 ' Ae q'V • -
BLD 1 ELE I MEC I PLM CITY OF ANAHE M
X BUILDING DIVISION
Permit Number: BLD2024-04072 200 S. ANAHEIM BLVD.
Issued: 08/08/2024 (714) 765 - 5153
www.anaheirntriet/building
(714)765-4626
Quarter Section: 109
Site Address: 918 E WEAVER LN, ANAHEIM, CA 92802
Legal Description: N TR 17920 ELK LOT 1 UN 21 LOT 1 OF TRACT 17920 OF
APN: 93206421
Project Description: Residential EV Charger Level 2
Living Area: Number of Stories:
Valuation: 0.00
Garage Area:
Construction Types:
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
Cool Root.
Total Fees paid for permit: 172.00
People Associated with Project:
Contractor EV PROS INC
PO BOX 4220 COSTA MESA, CA 92626
Permit Applicant EV PROS INC
PO BOX 4220 COSTA MESA, CA 92628
Type Electrical Fixtures Qty Type
Plumbing Fixtures Cry Mechanical Fixtures Oty
EV Charger 1
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNpHEIM c.�`
City of Anaheim 04 iQ
BUI)C)If19 DIVISIOft F Z
>
OVA'DED ygh
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 7655126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
JCOAJMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 7655163)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistrGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (ReinfJBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele_ Mec & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
fDo not backfill unless & cried off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service