Loading...
625 W VICTOR AVE A-BPermit Types SLID ELE MEC PLM X Permit Number: BLD2023.04405 Issued: 08/24/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 60 CITY OF ANAHEIM Site Address: 625 W VICTOR AVE A-B, ANAHEIM, CA 92801 Legal Description: N TR 1563 BLK LOT 2 3 APN: 27107118 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 Project Description: Reroof: To remove and install (2300) sq R of composition and shingles over house Living Area: Number of Stones: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony) Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Owner ANDRADE ELVIRA LASTRA TR 623 VICTORY AVE 11,500.00 N/A 341.50 Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. ��r, 4EIM �1` Cityof Anaheim OF iO Building Division F i �Orj'VDEO tbh^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned- Building Final (714 765-5153) Last Inspection -Final Only After Above Completed 1QZ3 IcH MZ/� Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) �(r1, AA Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service