939 N WEST STPermit Types
BLD EL MEC PLM
x
Permit Number: BLD2023-00508
Issued: 01/31/2023
www.a nahei m. net1building
(714)7654626
Quarter Section: 61
Site Address: 939 N WEST ST, ANAHEIM, CA 92801
Legal Description: P BK 246 PG 1 PAR 2
APN: 03404253
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
p141 765 - 5153
A�f-ice10pe
�\ 1 'asr,�,i
Project Description: Reroof: Remove existing to install (28) sq of composition shingles over entire house and attached. garage
Living Area: Number of Stones: 1 Valuation:
Garage Area: Constructlon Types:
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spnnklered:
Cool Rcof: Total Fees paid for Pnma:
People Associated with Project:
Contractor BENITEZ ROOFING 3302 S BIRCH ST202DOBD61435100930 SANTA ANA, CA 92707
Owner DE LA CRUZ ARMANDO 939 N WEST ST
1 1,00000
N/A
340.43
Type Electrical Fixtures Dry Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
Pap,HEIM ��<
Cityof Anaheim D4 iO
Building Division ti i
�0 IVDED rash
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ned.
Building Final (714 765-5153) 0
Last Inspection -Final Only After Above Completed
o.
,.
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
y
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd F
go —of (Sheathin iaphragm/Frame) _
Masonry (Reinf./Bond Beam/Pre-Grout)
14
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Ptbg Ele . Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construct on
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service