Loading...
528 N PLANTATION PL (2)Permit Types BLD ELE I MEC PLM X X X Permit Number: BLD2023.06663 Issued: 04/2912024 www.anaheim.net/building (714)765-4626 Quarter Section: 122 [SUELS1V_llYi� ,��1l1l Site Address: 528 N PLANTATION PL, ANAHEIM, CA 92806 Legal Description: N TR 3614 BLK LOT 54 APN: 26830230 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 Project Description: Residential Remodel: Remove non -bearing wall in kitchen, replace (1) window and replace window with slider and relocate washer & dryer into the garage. Living Area: Number of Stories: 1 Valuation: Garage Area: Construction Types. Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Root. Total Fees paid for Permit People Associated with Project 41,000.00 VS 2,254.57 Permit Applicant KIRK W WHEELER, PRESIDENT 4571 MIMOSA DRIVE YORBA LINDA, CA 92886 Owner LOCKETZ, PRISCILLA GREEN TR M H & P LOC 528 N PLANTATION PL Contractor K R M INDUSTRIES INC 4571 MIMOSA DRIVE200702211230423690 YORBA LINDA, CA 92807 Engineer- Civil MARK P RIVERA 5908 JASMINE ST STE B RIVERSIDE, CA 92504 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Receptacle, switches, lights 32 Dishwasher 1 Sub PanellTemp Pwr - Under 600 V, up to 1 Garbage Disposal 1 200 amps Kitchen Sink 1 Miscellaneous Fixture 1 Repair/Drainage Alteradon/Vent Piping 2 Washing Machine Rough 1 Water Distribution 2 Water Heater 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. '�P,Ft EIM C�< City of Anaheim DF iO Building Division /L_ i U > o�_J`ishn �DED Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 7 Plumbing Final 7 3 LA Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been Building Final (714 766.5153) Last Inspection -Final Only After Above Completed 7/g/�y l prL; Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below, until the following applicable items have been sianed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) jp 1$0yZ,- Rough Duct (Mechanical) Rough Mechanical Rough Electrical im "(E� Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_, Ele.. Meg & Fire) Insulation (Sound/Energy) ISOM " Do not tape or plaster until the following applicable items have been signed: Drywall 1J{ -rQo(Z, Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath g LN L, Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfril unless oned off) Sewer Water Engineering Backflow (Testable Only) Water Service