Loading...
535 S SHANNON STPermit Types BLD ELE MEC PLM X Permit Number: BLD2022-01520 Issued: 04/08/2022 wvvw.anaheim.net/building (714)765-4626 Quarter Section: 169 Site Address: 535 S SHANNON ST, ANAHEIM, CA 92807 Legal Description: N TR 8116 BLK LOT 1 APN: 36150101 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 • 5153 Project Description: Reroof: Tear off existing roofing material and install 32 sq. of Saxony 600 the 5.71b over house and attached garage Living Area: Number of Stones: 1 Valuation 11,200VO Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprmklered: Cool Roof: Total Fees paid for Permit: 339.46 People Associated with Project: Contractor ADVANCED ROOFING SYSTEMS INC 3673 N INDUSTRY AVE 4101 LAKEWOOD, CA 90755 Permit Applicant cados castillo Owner ALJAYEH MOHSEN 535 S SHANNON ST Type Electrical Fixtures Cry Type Plumbing Fixtures Oty Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PµPµEIM cq` Cityof Anaheim O� 4C Building Division z u ' OVNDED tah^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete unol the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioned- Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Petri Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1 at Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof(Sheathing/Diaphragm/Frame) ,5 2-L 11 4,14 Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Flog., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed' Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Grease Interceptor t" Sewer Water Engineering Backflow (Testable Only) Water Service