Loading...
529 N PLANTATION PLPermit Types BLD 1 EL E MEC PLM X Permit Number: BLD2024-03944 Issued: 07/31/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 122 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765. 5153 Site Address: 529 N PLANTATION PL, Anaheim, CA 92806 Legal Description: N TR 3614 BLK LOT 56 APN: 26830228 -: Project Description: Reroof: Remove and install (23) squares of composition shingles and (8) squares of flat torch down over house and attached garage. Living Area: Number of Stones: 1 Valuation: 6,930.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool poor. Total Fees paid for Permit: 372.90 People Associated with Project Contractor ROOFING DIVISION INC 8812 W PIPCO BLVD LOS ANGELES, CA Permit Applimot Luba Batioff Owner MORENO, AGUSTIN CERDA 8 ROSANNE 529 N PLANTATION PL Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Cty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. EIM Cq< City of Anaheim PNt,Hi D o Building Division F Z j > �DVNDED ta`'^� Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sian d Building Final (714765.5153) Last Inspection -Final Only Aker Above Completed I �l/ay f . �'lgfja Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roo ath DiaphragmlFranri Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Flag., Ele., Mec. & Fire) Insulation(Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service