529 N PLANTATION PLPermit Types
BLD 1 EL E MEC PLM
X
Permit Number: BLD2024-03944
Issued: 07/31/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 122
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714)765. 5153
Site Address: 529 N PLANTATION PL, Anaheim, CA 92806
Legal Description: N TR 3614 BLK LOT 56
APN: 26830228 -:
Project Description: Reroof: Remove and install (23) squares of composition shingles
and (8) squares of flat torch down over house and
attached garage.
Living Area: Number of Stones:
1 Valuation: 6,930.00
Garage Area:
Construction Types: N/A
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool poor.
Total Fees paid for Permit: 372.90
People Associated with Project
Contractor ROOFING DIVISION INC 8812 W PIPCO BLVD LOS ANGELES, CA
Permit Applimot Luba Batioff
Owner MORENO, AGUSTIN CERDA 8 ROSANNE 529 N PLANTATION PL
Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Cty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
EIM Cq<
City of Anaheim PNt,Hi
D o
Building Division F Z
j >
�DVNDED ta`'^�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sian d
Building Final (714765.5153)
Last Inspection -Final Only Aker Above Completed
I
�l/ay
f . �'lgfja
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roo ath DiaphragmlFranri
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Flag., Ele., Mec. & Fire)
Insulation(Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service