Loading...
505 E JULIANA STPermit Types BLD ELE MEC PLM X X X X 0 Permit Number: BLD2021-02210 Issued: 07/21/2021 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 81 Site Address: 505 E JULIANNA ST Legal Description: SEC 3 T 4 R 10 POR E1/2 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Change of Use: Convert 48,000 sq,ft existing warehouse to factory, legalization of unpermitted trench drains, and new drains, new interior foundation, plumbing, electrical to support equipment, blend room enclosure. New exterior foundation and framing for cooling tower. New 12' high chain link fence. New Ramp "Nor -Cal Beverage Co" Valuation: $750.000.00 Construcion Types: IIIB, Occupancy Groups: F2... . Fire Spdnklered? Yes Total Fass paid for Permit: 19,978.90 People Associated with Project: Owner NOR -CAL BEVERAGE CO 2286 STONE BLVD WEST SACRAMENTO Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty Meter/Disc Sw - > 600 V, 1000 to 2500 amps 1 Floor Drain Sub PaneI1Temp Pwr - < 600 V, 0 < amps 2 <= 200 Sub Panellremp Pwr - < 600 V, 200 < amps 1 — 500 Sub Paneirremp Pwr- < 600 V, 500 < amps 2 <= 1000 Receptacle, switches, lights 147 Apparatus or equipment not listed 6 Motors -over 1 h.p. to 10 h.p. 5 Motors - over 10 h.p. 18 Generators/Transformers - 1 to 10 hp, 1 to 3 75 kva Generators/Transformers - over 10 hp, over 2 75 kva 1 Cooling Tower 1 Ventilation Fan -> 300 cfm on single duct 3 Air Handling Units 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. Ud pcnml_combc PNPHEtM cq( Cityof Anaheim O Building Division _-�2 >I I i DIED Do not occuov this t. ding until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final �' ,f✓ Mechanical Final PERM Cross Connection Control (714) 765.4260 Engineering Final (714) 765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 L Do not pour concre-..: -._ l owng applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 DATE. Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 766.5194 (Allow 10 business days) Setback/Formslrrenches (Footings) 2 COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections 2 S �, Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out); Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections (� cg�2�22 i�[j, • �( Kii>� Framing (Only after Plbg.. Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mee & Plbg) Interior Lath Exterior Lath Electrical Inspections -k 4rr Pf 1-d Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New L{tlyi2'Z `/ F ppQ Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mac.) �1 Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service I Pinio PLUMP Engineering, Inc. 914 E. Katella Ave. Anaheim, California 92805 P:714.385.1835 F:714.385.1834 nuu uwww Peica.corn February 14, 2022 Mr. Kevin Cordova Nor -Cal Beverage Co. 1226 North Olive Street Anaheim, CA 92801 RE: Nor -Cal Beverage -Line A6 1226 North Olive Street Anaheim, CA 92801 0.22.0 - V.aA-y I C-•,-I V - �...d dQ���"# "- .,• `j. [. .iE far-off . S � E'rc�. � p Foundation for: • Cooling Tower — 54' C`c,.,o3•�_ ;' 3�2t�zz pK ✓ I(/go Cooling Tunnel v GQ .We Fugi 1 �P ,VAFugi 2 V6_p j • Rison �yG • Trench Drains and Drain Lines -mod K��• Palletizer �F/ ii• Depal f✓Z' Wrapper During construction PEI visit the site to review the installation of the above mention equipment foundation. PEI performed structural observation for each piece of equipment and the following was observed: • Foundation length, width and depth. • Reinforcement steel size, placement and spacing. • Concrete design mix • Deputy inspection reports Based on PEI's structural observation and reviewing all the information in regards to the foundation of the above mention equipment, the foundation complied with the requirements of PEI's structural engineered construction documents. See the attacked location plan, pictures and reports. No. C 112696 Richard Plump, -31-22 President -I-