505 E JULIANA STPermit Types
BLD
ELE
MEC
PLM
X
X
X
X
0
Permit Number: BLD2021-02210
Issued: 07/21/2021
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 81
Site Address: 505 E JULIANNA ST
Legal Description: SEC 3 T 4 R 10 POR E1/2
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Change of Use: Convert 48,000 sq,ft existing warehouse to factory, legalization of unpermitted trench
drains, and new drains, new interior foundation, plumbing, electrical to support equipment, blend room enclosure. New exterior
foundation and framing for cooling tower. New 12' high chain link fence. New Ramp "Nor -Cal Beverage Co"
Valuation:
$750.000.00
Construcion Types:
IIIB,
Occupancy Groups:
F2... .
Fire Spdnklered?
Yes
Total Fass paid for Permit:
19,978.90
People Associated with Project:
Owner NOR -CAL BEVERAGE CO 2286 STONE BLVD WEST SACRAMENTO
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty
Meter/Disc Sw - > 600 V, 1000 to 2500 amps
1 Floor Drain
Sub PaneI1Temp Pwr - < 600 V, 0 < amps
2
<= 200
Sub Panellremp Pwr - < 600 V, 200 < amps
1
— 500
Sub Paneirremp Pwr- < 600 V, 500 < amps
2
<= 1000
Receptacle, switches, lights
147
Apparatus or equipment not listed
6
Motors -over 1 h.p. to 10 h.p.
5
Motors - over 10 h.p.
18
Generators/Transformers - 1 to 10 hp, 1 to
3
75 kva
Generators/Transformers - over 10 hp, over
2
75 kva
1 Cooling Tower 1
Ventilation Fan -> 300 cfm on single duct 3
Air Handling Units 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. Ud pcnml_combc
PNPHEtM cq(
Cityof Anaheim O
Building Division _-�2
>I
I
i
DIED
Do not occuov this t. ding until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
�'
,f✓
Mechanical Final
PERM
Cross Connection Control (714) 765.4260
Engineering Final (714) 765-5126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
L
Do not pour concre-..: -._ l owng applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591 DATE.
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 766.5194 (Allow 10 business days)
Setback/Formslrrenches (Footings) 2
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
2
S �,
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out);
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
(� cg�2�22 i�[j, • �( Kii>�
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
-k 4rr Pf 1-d
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
L{tlyi2'Z
`/
F ppQ
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mac.) �1
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
I
Pinio
PLUMP Engineering, Inc.
914 E. Katella Ave.
Anaheim, California 92805
P:714.385.1835 F:714.385.1834
nuu uwww Peica.corn
February 14, 2022
Mr. Kevin Cordova
Nor -Cal Beverage Co.
1226 North Olive Street
Anaheim, CA 92801
RE: Nor -Cal Beverage -Line A6
1226 North Olive Street
Anaheim, CA 92801
0.22.0 - V.aA-y I C-•,-I V - �...d dQ���"# "-
.,• `j. [. .iE far-off . S � E'rc�. � p
Foundation for:
• Cooling Tower — 54' C`c,.,o3•�_ ;' 3�2t�zz
pK ✓
I(/go Cooling Tunnel
v GQ
.We Fugi 1
�P
,VAFugi 2
V6_p
j • Rison
�yG • Trench Drains and Drain Lines -mod
K��• Palletizer
�F/ ii• Depal
f✓Z' Wrapper
During construction PEI visit the site to review the installation of the above mention
equipment foundation. PEI performed structural observation for each piece of equipment
and the following was observed:
• Foundation length, width and depth.
• Reinforcement steel size, placement and spacing.
• Concrete design mix
• Deputy inspection reports
Based on PEI's structural observation and reviewing all the information in regards to the
foundation of the above mention equipment, the foundation complied with the
requirements of PEI's structural engineered construction documents.
See the attacked location plan, pictures and reports.
No. C 112696
Richard Plump, -31-22
President
-I-