Permit Number: BLD2024-03094
Issued: 07/16/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 81
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 • 5153
Site Address: 325 E JULIANNA ST, ANAHEIM, CA 92801
_
Legal Description: A TR SCHAFFER & OSWALD SUB BLK LOT 25
_
APN: 26716207
Project Description: Photovoltaic System: Install roof mounted solar with (18) Modules, (1) inverter, and (1) ESS
Living Area: Number of Stories:
I Valuation: 18,000.00
Garage Area:
Construction Types: NIA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permit: 990.34
People Associated with Project:
Owner YBARRA, VERA A
325 E JULIANNA ST
Contractor SUNRUN
21 WORLDS FAIR DRIVE200807221505542300 SOMERSET, NJ 92614
Engineer - Civil Eugene Munyanziza
23833 Copper Court Wlldomar, CA 92595
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City
ESS (Battery Storage) 1
Inverter 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P MEW CMe
Cityof Anaheim O4 iO
Building Division F i
• �OVNDED 28h^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
I DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-6041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765.6194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sianed
Building Final (714 765-6153)
Last Inspection -Final Only After Above Completed
I
l��l.•�
lA.f�
�•S ��
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler(Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec 8. Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backf it unless smned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service