Loading...
712 S LOST CANYON RD (4)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-01422 Issued: 03/19/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 208 CITY OF ANAHEIM Site Address: 712 S LOST CANYON RD, ANAHEIM, CA 92808 Legal Description: N TR 12689 BLK LOT 39 APN: 35650121 BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 - 6163 Project Description: Reroof: Remove existing to install (32) sq of heavy weight Tile (9.70 psf) over entire house and attached garage Living Area: Number of Stories: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Contractor C&AMP;A ROOFING INC 27637 ROCKWOOD AVENUE MORENO VALLEY, CA 92555 Permit Applicant Juan Suarez Owner MAYFIELD, BERNARD 712 S LOST CANYON RD 15,000.00 VA 729.95 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Ob The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�pHgIM C'< Cityof Anaheim o4 iO Building Division h i U ' �ooNpgo tsy^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-6153) Last Inspection -Final Only After Above Completed fY 1.L1llf Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) 3 y Dof zi Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only aflei Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service 12$0 ' 1HZZ ?£5 LZ)5%RNYOf� RDA roS ct Engineering, Inc. 450 Folsom Street, #1502 ANAHEIM, GA San Francisco, CA 94105 ROOF FRAMING REVIEW FOR NEW ROOFING IN5TALLATION ANALYSIS 15 FOR THE EVALUATION OF THE EXI5TING RAFTER FRAMING AT ?I2 SOUTH L05T CANYON ROAD, ANAHEIM, CA, FOR THE REROOFING TO BE INSTALLED i i i i i i i i CODES - CALIFORNIA BUILDING CODE GBG 2022 ASCE STANDARD -1-I6 / WOOD - NATIONAL DESIGN SPECIFICATION - MD: - DOU&LA5 FIR - LARCH llliii - .JOISTS AND RAFTERS - NO. 2 - BEAMS (4x 6 LARGER) - NO. I - POSTS d GOLUMN5 - NO. I ROOF MATERIALS - "EAGLE ROOFING PRODUCTS" - PONDER05A STYLE - WE16HT = 9'70#/100 50. FT. = 9.'10 p5P J O B 2024031102 SHT. I OF 4 DES. GLH DATE 5/24 L. TFIE •;•.:; PEWA1T DOES NOT AP'i - ...: 0� ANY OF THE P.UIIAANC� Cl_'iJES VF THE CITY. THE HOIDLR C•r THIS PERMIT PROCEEDS AT HIS OWN RISK. MAR 19 2024 BUILDING DIVISION OF ANAHEIM APPROM BY �m2 ProStruct Engineering, Inc. 712 5 L05T GAVON RD 450 Folsom Street, #1502 San Francisco, CA 94105 ROOF FRAMING REVIEW ROOF PLAN 4 RAFTER LAYOUT ANAHE I M, GA ROOF FRAMING REVIEW FOR NEA ROOFING IN5TALLATION F L A N J o B 2024031102 SHT. 2 DES. 6LH DATE 3/24 ProStruct Engineering, Inc. 450 Folsom Street, #1502 San Francisco, CA 94105 ROOF FRAMING REVIEW 112 5 L05T CANYON RD ANAHEIM, GA ROOF FRAMING REVIEW FOR NEW ROOFING INSTALLATION J O e 2024031102 SHT. 3 DES. GLH DATE 5/24 RAFTER ANALY515 CHECK EXISTING RAFTERS FOR DL + RLL NEW ROOFING 15 "EAGLE ROOFING PRODUCTS" PONDEROSA STYLE WEIGHT = 4"70#/100 50. FT. = 4.10 psf DEAD LOAD = u2" Wood 5heoth + Roofing + Insul + Misc = 2 psf + C1 10 psf + I psf + I psf = 13.10 psf x 1.33 it. (Spc'g) + 4.8 #/ft. (2XIO) = 23.0 #/ft. ROOF RAFTER AREA = 23.14 ft. x 1.55 ft. = 31 sq,. ft. < 200 5c1. ft. --> ROOF LL = 20 psf ROOF LL = 20 psf x 1.55 ft. (Spc'g) = 26.6 #/ft. MAX. SPAN = 20'-0 afa" = 20.05 ft. (U5E SLOPE AS SPAN) MOMENT = wL"2 / 8 M-DL = (25.0 #/itJ x (20.05 ft.)^2 / 8 = 1,155 #-ft. M-RLL = (26.6 #/ft.) x (20.05 ftJ"2 / 8 = 1,334 #-ft. SHEAR = wL / 2 V-DL = (25.0 #/ftJ x (20.05 ft.) / 2 = 230# V-RLL = (26.6 #/ftJ x (20.05 ftJ / 2 = 266# IW-O", MAX. FOR A 2 x 10 5x = 21.34 In.-5 Fb - 400 psi (#2 DF-Larch) V-L V-R Cd = OAO ( OL ) Cd = 1.25 ( DL + RLL) Of = 1.1 ( 2XIO ) Cr = 1.15 Cm = 1.0 FOR DL: fb = M/5x = (1,155 #-ft) x 12 / (2I.34 In. "3) = 64-1 psi Fb'= Fin x Cd x Of x Cr x Cm = 4OO psi x 0.40 x 1.10 x 1.15 x 1.0 = 1,025 psi > 647 psi --> OK FOR DL + RLI fb = M/Sx = (1,153 #-ft. + 1,334 #40 x 12 / (21.39 in.."3) = 1,395 psi Fb' =Fbx Cd x Gf xCr x Cm = 400 psi x 1.25 x 1.10 x 1.15 x 1.0 = 1,425 psi > 1,345 pat --> OK DEFLECTION = BY ANALYSIS DL = 0.526 in. I TL = L/120 = 20.05 ft./120 = 2.005 In. > 1.134 In. RLL = 0.605 in. RILL = L/150 = 20.05 ft✓180 = 1.555 In. > 0.608 in. TL = 1.134 In. ROOF MEMBERS DO NOT SUPPORT CEILING EX 2 x 10 RAFTERS --> OK BY INSPECTION, MAXIMUM SPAN W4,5 FOUND SATISFACTORY, THEREFORE, ALL 2x10 RAFTER SPANS ARE 5ATI5FACTORY 112 5 L05T CANYON RP JOB 2024031102 ProStruct Engineering, Inc. 450 Folsom Street, #1502 ANAHE I M, GA sHr. 4 of 4 San Francisco, CA 94105 DES. GLH ROOF FRAMING REVIEW FOR NEW ROOFING INSTALLATION DATE 3/24 ROOF FRAMING REVIEW THE PRECEDING RAFTER ANALYSIS HAS SHOWN THAT THE MAXIMUM RAFTER SPAN 15 SATISFACTORY FOR THE NEW ROOFING LOADS (NEW ROOFING MATERIAL WEIGHT NOTED). THEREFORE, ALL OTHER RAFTER SPANS ARE 5ATI5FACTORY, BY INSPECTION. PLAN DIMEN51ONS WERE PROVIDED BY THE CONTRACTOR AND A VISUAL REVIEW WAS PERFORMED TO DETERMINE RAFTER SIZE. AT THIS TIME, NO STRENGTHENING IS REQUIRED. THE PRECEDING STRUCTURAL ANALYSIS HAS BEEN PERFORMED BY PROSTRUCT ENGINEERING, INC. EXPRESSLY FOR THE PROJECT LOCATED AT -712 5. LOST CANYON ROAD IN ANAHEIM, CALIFORNIA. THE ANALY515 AND RECOMMENDATIONS ARE BASED ON THE A5-BUILT CONDITIONS AT THE TIME OF THE STRUCTURAL SURVEY PERFORMED ON MARCH 15, 2024. ANY ALTERATIONS OR MODIFICATIONS TO THE EXISTING ROOF STRUCTURE AFTER THE SURVEY DATE HAVE NOT BEEN TAKEN INTO ACCOUNT. IF ANY MODIFICATIONS HAVE OCCURRED, FURTHER INVESTIGATION AND ANALY515 WOULD BE REQUIRED PRIOR TO IMPLEMENTING ANY REROOFING OR STRENGTHENING. L. EXP. 3,2025 No. OU0758 :H 15, 2024 DATE