Loading...
785 S CAMINO GRANDE 1-6Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-05750 Issued: 11/01/2023 www.anahem.net/building (714)765-4626 Quarter Section: 205 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765 - 6153 Site Address: 785 S CAMINO GRANDE 1-6ANAHEIM, CA 92807 Legal Description: N TR 7929 BLK LOT 54 APN: 36501354 Project Description: Reroof to remove and install (70) squares of composition and shingles over entire complex (units #1-6) Living Area: Number of Stones: 2 Valuation: 75.000.00 Garage Area: Construction Types: WA carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 464.00 People Associated with Project: Contractor ROOFING STANDARDS INC 930 LAWRENCE STABCDE11155192 PLACENTIA, CA 92870 Permit Applicant Samuel Herrera Owner AKAHOSHI, KEVIN & SPRINNA 785 S CAMINO GRANDE 4 Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures The permit shall expire by limitation and become null and void if the building or work has not passed Final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNPHEt,H �q< Cityof Anaheim OF iO Building Division ' z u > �o�Npep vs�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subtloor or pour floor slab until the follwing applicable items have been sioned Building Final (714 765-5153) Last Inspection -Final Only After Above Completed LLx'N Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) L3 Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service