Permit Number: BLD2024-02445
Issued: 07/03/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 76
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 777 W KATELLA AVE 432, ANAHEIM, CA 92802
Legal Description: S TWP 4 RGE 10 SEC 22 T4 R10 SEC 22 FOR OF W 112
APN: 08219027
Project Description: DCA - Redwood Creek Trail - Villain's Grove - Miscellaneous: Construct (4) permanent footings with (2) temporary
scenic trees.
Living Area: Number of Stories: 0 Valuation: 250,000.00
Garage Area: Consouction Types: N/A
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spdnklered.
Cool Roof: Total Fees paid for Pennk; 1,362.00
People Associated with Project:
Permit Applicant PAYTON BEABER 1313 S HARBOR BLVD ANAHEIM, CA 92802
Owner WALT DISNEY PARKS AND RESORTS US INC PO BOX 313
Type Electrical Fixtures Cry Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNpHetAt C�`
Cityof Anaheim OF V
Building Division ti i
a >
OVNOEp te`'^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 765-5126
INSPECTION
DATE
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
Sr aned
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
r
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (CompactionWembrane Reinf.)
Floor (JoisVGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sind
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless sioned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service
PublicWorks
Structural Observation Report Form
STRUCTURAL OBSERVATION means the visual observation of the structural system, for general
conformance to the approved plans and specifications, at significant construction stages and at
completion of the structural system. Structural observation does not include or waive the responsibility for
the inspections required by Section 110 1704 or other sections of the Code
Report No.
This report includes all construction work through 14 days of August , 2024 Page No�of 01
PROJECT ADDRESS: Redwood Creek Challenge Trail,
STRUCTURAL OBSERVER OF
SOR PHONE NO..
777 W Katella Ave 432 Anaheim CA 92802
RECORD (SOR); Paloma Paredes
(310) 373-5573
Building Permit No.:
Structural Observation
Observer Professional Lic./Reg.
Observer Phone No.:
BLD 2024-02445
performed by:Paloma Parede
No.: C 80664
(760) 501-1357
OBSERVED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS
PORTION
FOUNDATION
WALL
FRAMES
FLOOR
OBSERVED, IF NOT
WHOLE
® Footing, Stem Walls
❑
❑Steel Moment
❑Concrete
Concrete
Frame
❑ Mat Foundation
❑
❑ Steel Braced Frame
Steel
Mason
Deck
[]
❑ Caisson, Piles, Grade
❑ Wood
❑ Concrete Moment
❑ Wood
Beams
Frame
❑ Retaining Foundation
❑ Other:
❑ Masonry Wall
❑ Others:
Hillside Special Anchors
Frame
❑ Others:
® Others:
I DECLARE THAT THE FOLLOWING ARE TRUE TO THE BEST OF MY KNOWLEDGE:
I am the engineer or architect retained by the owner to be in responsible charge for
the structural observation in accordance with the requirements of the County of
Orange.
I, or another Engineer or Architect who I have designated above and is under my
responsible charge, has performed the required site visits at each significant
construction stage to verify if the structure is in general conformance with
approved plans and specifications;
DATE
300 N. Flower Street, Santa Ana, CA 92703
P.O. Box 4048, Santa Ana, CA 92702-4048
STAMP OF STRUCTURAL
OBSERVER OF RECORD
www.ocpublicworks.com
P: 714.667.8888 1 F: 714.667.7575
Revised 0212017 ocpcustomercare@ocpw.ocgov.com
HOPPER ENGINEERING ASSOCIATES
California License No.: 20498
FAx: (310) 791-7308
www.hopperengineering.com
300 Vista Del Mar
Redondo Beach, CA 90277
(310) 373-5573
September 19, 2024
PR4-475
VIA ELECTRONIC EMAIL
Payton Beaber
Disney Live Entertainment
Subject: Structural Observation Of Disney Halloween Faux Trees - BLD 2024-02445
This letter is to certify that 1, the Engineer of Record (EOR) for the Halloween
faux trees & footings, have reviewed the construction completed to date and no
deficiencies are observed.
Paloma Paredes of Hopper Engineering performed a structural observation
on my behalf on August 141h, 2024. Separately on June 15C, 2024, Koury Engineering
evaluated the site preparation prior to concrete being poured and sampled/tested the
concrete mix, which meets (and exceeds) the required compressive strength. Upon
review of the photos and other supporting documentation, I concur with the findings of
both reports. The structural observation report form by Hopper Engineering and the
inspector's report by Koury Engineering are both enclosed with this letter.
Thank you for your consideration in this matter. If you have any questions,
Please contact the undersigned.
Exp. 3/31/2025
Enclosures
Best Regards,
Kyl Crowder
Professional Engineer
C92086